Orange County NC Website
Orange County Emergency Services -Generator <br />PDC Project 24030 Engine Generators 26 32 13 - 10 <br />J.Correct defective work,adjust for proper operation,and retest until entire system complies with <br />Contract Documents. <br />K.Submit detailed reports indicating inspection and testing results and corrective actions taken. <br />3.04 CLEANING <br />A.Clean exposed surfaces to remove dirt,paint,or other foreign material and restore to match <br />original factory finish. <br />3.05 CLOSEOUT ACTIVITIES <br />A.Demonstration: Demonstrate proper operation of system to Owner,and correct deficiencies or <br />make adjustments as directed. <br />B.Training: Train Owner's personnel on operation,adjustment,and maintenance of system. <br />1.Use operation and maintenance manual as training reference,supplemented with additional <br />training materials as required. <br />2.Provide minimum of four hours of training. <br />3.Instructor: Manufacturer's authorized representative. <br />4.Location: At project site. <br />C.After successful acceptance test and just prior to Project Acceptance,replace air,oil,and fuel <br />filters and fill fuel storage tank. <br />3.06 PROTECTION <br />A.Protect installed engine generator system from subsequent construction operations. <br />3.07 MAINTENANCE <br />A.See Section 01 70 00 -Execution and Closeout Requirements <br />END OF SECTION 26 32 13 <br />Docusign Envelope ID: DEDB83DA-7916-8AE5-81B0-AA1EA4D56AE9