Browse
Search
2026-161-E-AMS-Simpson Electrical-Emergency Services - Install Additional Generator
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-161-E-AMS-Simpson Electrical-Emergency Services - Install Additional Generator
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 2:00:49 PM
Creation date
5/13/2026 1:41:48 PM
Metadata
Fields
Template:
Contract
Date
4/21/2026
Contract Starting Date
4/21/2026
Contract Ending Date
4/29/2026
Contract Document Type
Contract
Amount
$229,750.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Emergency Services -Generator <br />PDC Project 24030 Grounding and Bonding for Electrical <br />Systems 26 05 26 - 3 <br />a.Space electrodes not less than 10 feet from each other and any other ground electrode <br />until maximum allowed resistance to ground is achieved. <br />b.Where location is not indicated,locate electrode(s)at least 5 feet outside building <br />perimeter foundation as near as possible to electrical service entrance;where possible, <br />locate in softscape (uncovered)area. <br />6.Provide additional ground electrode(s)as required to achieve specified grounding electrode <br />system resistance. <br />G.Service-Supplied System Grounding: <br />1.For each service disconnect,provide grounding electrode conductor to connect neutral <br />(grounded)service conductor to grounding electrode system.Unless otherwise indicated, <br />make connection at neutral (grounded)bus in service disconnect enclosure. <br />2.For each service disconnect,provide main bonding jumper to connect neutral (grounded)bus <br />to equipment ground bus where not factory-installed.Do not make any other connections <br />between neutral (grounded)conductors and ground on load side of service disconnect. <br />H.Separately Derived System Grounding: <br />1.Separately derived systems include,but are not limited to: <br />a.Transformers. <br />b.Uninterruptible power supplies (UPS),when configured as separately derived systems. <br />c.Generators,when neutral is switched in the transfer switch. <br />2.Provide grounding electrode conductor to connect derived system grounded conductor to <br />nearest effectively grounded metal building frame.Unless otherwise indicated,make <br />connection at neutral (grounded)bus in source enclosure. <br />3.Provide bonding jumper to connect derived system grounded conductor to nearest metal <br />building frame and nearest metal water piping in the area served by the derived system, <br />where not already used as a grounding electrode for the derived system.Make connection at <br />same location as grounding electrode conductor connection. <br />4.Where common grounding electrode conductor ground riser is used for tap connections to <br />multiple separately derived systems,provide bonding jumper to connect the metal building <br />frame and metal water piping in the area served by the derived system to the common <br />grounding electrode conductor. <br />5.Provide system bonding jumper to connect system grounded conductor to equipment ground <br />bus.Make connection at same location as grounding electrode conductor connection.Do not <br />make any other connections between neutral (grounded)conductors and ground on load side <br />of separately derived system disconnect. <br />I.Bonding and Equipment Grounding: <br />1.Provide bonding for equipment grounding conductors,equipment ground busses,metallic <br />equipment enclosures,metallic raceways and boxes,device grounding terminals,and other <br />normally non-current-carrying conductive materials enclosing electrical conductors/equipment <br />or likely to become energized as indicated and in accordance with NFPA 70. <br />2.Provide insulated equipment grounding conductor in each feeder and branch circuit raceway. <br />Do not use raceways as sole equipment grounding conductor. <br />3.Where circuit conductor sizes are increased for voltage drop,increase size of equipment <br />grounding conductor proportionally in accordance with NFPA 70. <br />4.Unless otherwise indicated,connect wiring device grounding terminal to branch circuit <br />equipment grounding conductor and to outlet box with bonding jumper. <br />5.Terminate branch circuit equipment grounding conductors on solidly bonded equipment <br />ground bus only.Do not terminate on neutral (grounded)or isolated/insulated ground bus. <br />6.Provide bonding jumper across expansion or expansion/deflection fittings provided to <br />accommodate conduit movement. <br />7.Provide bonding for interior metal piping systems in accordance with NFPA 70.This includes, <br />but is not limited to: <br />Docusign Envelope ID: DEDB83DA-7916-8AE5-81B0-AA1EA4D56AE9
The URL can be used to link to this page
Your browser does not support the video tag.