Orange County NC Website
Project - Hillsborough, NC <br />P a g e | 2 <br /> <br /> <br /> <br /> <br /> <br />Exclusions: <br /> <br />1. Engineering and associated fees. <br />2. Payment and performance bond. Add 1.5% if desired. <br />3. Costs to expedite material. <br />4. Code required modifications and corrections to existing items that are not part of project scope. <br />5. Removal and replacement of ceiling required for installation of new conduit. <br />6. Extended warranties <br />7. As-Built Drawings in CAD. <br />8. Off-site material storage. <br />9. Overtime or after-hours work. <br /> <br /> <br /> <br />Base Bid---------------------------------------------------------------------------$ 18,337.00 <br /> <br /> <br />We thank you for the opportunity to present this proposal and trust that it meets with your approval. Please <br />contact me if you have any questions or if we can be of further assistance, I can be reached at 919 -383- <br />2526 extension 141 or e-mail at will.hanna@bryantdurham.com <br /> <br />Respectfully, <br />Bryant Durham Electric Company, Inc. <br /> <br />Will Hanna <br /> <br />Will Hanna <br />Assistant Project Manager <br />Docusign Envelope ID: 34A2CD69-71C0-8241-8024-0072A71A5E7A