Orange County NC Website
53 Asheland Ave • Suite 103 • Asheville, NC <br /> 828-615-6056 • pisgahenergy.com <br /> PISGAH ENERGY <br /> <br />Change Order <br /> <br />Project Name: Feasibility Studies for Town of Hillsborough Sites, as identified <br />in Attachment A – Solar Feasibility Study REV 2 0703. <br /> <br />Date: 3/4/2026 Budget Code #: 61370035-870000-10090 PO#: 02600937 <br /> <br />Change Order #: 1 <br /> <br />Requesting Party: Town of Hillsborough <br /> <br />Change(s) Proposed: For Adron Thompson Water Treatment Plant, the Town <br />of Hillsborough would like to assess rooftop solar for 2 buildings instead of <br />assessing solar for ground-mounted opportunities. For the Wastewater <br />Treatment Plant, the Town of Hillsborough would like to assess rooftop solar <br />for 2 buildings instead of assessing solar for ground-mounted opportunities. <br />The cost adder to remove the ground mount studies and add roof-top solar <br />studies for the 4 total buildings across both facilities is $11,521. <br /> <br />Reason for Change(s): 1 - Adron Thompson and the Wastewater Plant were <br />identified for ground-mounted solar opportunities and The Town of <br />Hillsborough would like rooftop solar to be assessed and does not want <br />assessments for ground-mounted solar. <br /> <br />Supporting Attachment(s): <br />Solar Feasibility Study Proposal Rev 2 07032025 <br /> <br /> <br /> <br /> <br />DESIGN & DEVELOPMENT <br /> <br /> <br />Docusign Envelope ID: 65FC57FC-F176-8657-828A-CDF4389A2E31