Orange County, NC <br /> Asset Management Services <br />RFP – 367-OC5473 Orange County Solar Installation for Cedar Grove Community Center <br /> <br />17 <br /> <br /> <br />Utility Interconnection <br />1. Contractor will provide final single line drawings, including any changes in equipment and <br />including solar module and inverter models and ratings, to Pisgah Energy (samantha.kegley@ <br />pisgahenergy.com) prior to beginning work on site. <br />2. Provide a copy of the proof of final electrical inspection to Pisgah Energy <br />(samantha.kegley@pisgahenergy.com) for Duke Energy interconnection purposes. <br /> <br />Installation <br />1. Contractor to provide all supervision, equipment, labor, materials, etc., to complete the <br />installation as shown on the plans, specifications, and addendum, and according to all applicable <br />codes, rules, and regulations. <br />2. Plan installation work to minimize the impact on the flow of regular work at the facility. The <br />building shall remain occupied during construction. Contractor to make every effort to avoid <br />impeding normal business operations. <br />3. If a shutdown is required to make the final connection to the building electrical system, Contractor <br />to coordinate shutdown plans with the Owner and the utility. Contractor shall endeavor to meet <br />the Owners’ desired schedule, even if the shutdown needs to occur after hours or on the weekend. <br />a. A full building shutdown is preferred when making the final connection to the building <br />electrical system. <br />QC Inspections <br />1. Provide a construction schedule to Pisgah Energy (nicholas.baynard@pisgahenergy.com) to <br />facilitate the quality control inspection process. <br />2. Provide photos and remove equipment covers as requested to facilitate Progress/QC inspections <br />by Pisgah Energy. <br />3. Complete correction/punch list items resulting from inspections as requested and submit <br />photographic evidence to the inspector. <br /> <br />Communications and Monitoring <br />1. Daisy chain inverters and bring network cable from the master inverter to the IDF switch or <br />building network closet, as shown in the plans and specifications. <br />2. Coordinate with Owner to make the final connection to the switch and open ports as necessary to <br />allow communication with SolarEdge. <br />3. Provide full administrative SolarEdge monitoring portal access to Orange County and Pisgah <br />Energy as requested. <br />Commissioning/Project Close Out <br />1. Complete punch list items as requested. <br />2. Commission the system and test for proper operation once the project has passed final AHJ <br />inspection. <br />3. Provide project close-out documents to Pisgah Energy and Orange County as required in the plans <br />Docusign Envelope ID: CF064D56-F89A-8651-8229-D168AFF8B909