Browse
Search
2026-145-E-AMS-Cate Associates Inc. dba Yes Solar Solutions- Cedar Grove Community Center Solar Installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-145-E-AMS-Cate Associates Inc. dba Yes Solar Solutions- Cedar Grove Community Center Solar Installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 1:32:57 PM
Creation date
5/13/2026 1:29:00 PM
Metadata
Fields
Template:
Contract
Date
4/22/2026
Contract Starting Date
4/22/2026
Contract Ending Date
4/29/2026
Contract Document Type
Contract
Amount
$139,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A. PREPARE THREE (3) COPIES OF OPERATING AND MAINTENANCE MANUALS <br />IN HARD COVER BINDERS AND DELIVER TO THE OWNER. ALSO PROVIDE <br />DIGTAL COPY OF THE BINDER MATERIALS. AT A MINIMUM THE BINDERS <br />SHALL INCLUDE: <br />1. COMPLETE SET OF ALL APPROVED SUBMITTALS INCLUDING SHOP <br />DRAWINGS AND PRODUCT LITERATURE. <br />2. AS BUILT DRAWINGS SHOWING THE FINAL PLACEMENT OF ALL <br />PANELS, COMBINER BOXES, CONNECTIONS, AND CONDUIT <br />PLACEMENT. <br />3. AS BUILT ELECTRICAL PLANS, INCLUDING THREE LINE DIAGRAM, <br />AND ELEVATION DRAWINGS SHOWING THE FINAL PLACEMENT OF <br />THE ELECTRICAL EQUIPMENT. <br />4. CLEANING INSTRUCTIONS FOR THE PV PANELS. <br />5. COPIES OF ALL START-UP PROCEDURES MEASUREMENTS. <br />6. COPIES OF ALL TESTING DATA AND REPORTS. <br /> <br />21. COMMISSIONING <br />A. PRIOR TO COMMISSIONING THE SYSTEM, ALL WIRING SHALL BE TESTED <br />FOR RESISTANCE, CONTINUITY, AND GROUNDS BEFORE BEING <br />ENERGIZED. DC-DC CONVERTER OUTPUT CIRCUITS SHALL BE TESTED FOR <br />SAFETY VOLTAGE AT THE INVERTER AFTER INSTALLATION IS <br />COMPLETED. FAULTY WIRING SHALL BE REPLACED AT NO ADDITIONAL <br />EXPENSE TO THE OWNER. PROVIDING SUBCONTRACTOR SHALL ENSURE A <br />TESTING RESULTS REPORT IS INCLUDED AS A PART OF CLOSE OUT <br />DOCUMENTS. <br />B. THE SOLAR PHOTOVOLTAIC SYSTEM SHALL BE COMMISSIONED UPON <br />COMPLETION OF THE INSTALLATION. ALL A/E PUNCH LIST ITEMS FOR THE <br />SYSTEM SHALL BE CORRECTED. <br />1. A CONSTRUCTION CHECKLIST FOR EACH ARRAY SHALL BE <br />COMPLETE PRIOR TO FUNCTIONAL TESTING. <br />2. ALL CONTROL AND MONITORING SYSTEM FUNCTIONS FOR THIS <br />AND ALL INTERLOCKING SYSTEMS SHALL HAVE BEEN <br />PROGRAMMED AND OPERABLE, INCLUDING ALL MONITOR POINTS. <br />3. EACH STRING SHALL BE TESTED FOR SAFETY VOLTAGE AND A <br />REPORT WILL BE PROVIDED TO THE ENGINEER. <br /> 4. PROVIDE INSULATION RESISTANCE TESTING ON HOME RUN CABLES. <br />C. PROVIDE WEB BASED MONITORING ACCESS TO OWNER AND OWNERS <br />AGENT WITH FULL ADMINISTRATIVE ACCESS. <br /> <br /> <br />Docusign Envelope ID: CF064D56-F89A-8651-8229-D168AFF8B909
The URL can be used to link to this page
Your browser does not support the video tag.