Browse
Search
2026-145-E-AMS-Cate Associates Inc. dba Yes Solar Solutions- Cedar Grove Community Center Solar Installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-145-E-AMS-Cate Associates Inc. dba Yes Solar Solutions- Cedar Grove Community Center Solar Installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 1:32:57 PM
Creation date
5/13/2026 1:29:00 PM
Metadata
Fields
Template:
Contract
Date
4/22/2026
Contract Starting Date
4/22/2026
Contract Ending Date
4/29/2026
Contract Document Type
Contract
Amount
$139,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE PLANS AND SPECIFICATIONS, THE NEC, OR OTHER CODES OR <br />REQUIREMENTS, THE CONTRACTOR SHALL IMMEDIATELY BRING THE <br />PROBLEM TO THE ATTENTION OF THE SOLAR DESIGNER AND/OR <br />ELECTRICAL ENGINEER FOR RESOLUTION PRIOR TO THE EXECUTION OF <br />THE WORK. <br />U. WHERE THERE ARE CONFLICTS BETWEEN THE PLANS AND <br />SPECIFICATIONS, THE CONTRACTOR SHALL BRING THE ISSUE TO THE <br />ATTENTION OF THE ENGINEER FOR RESOLUTION PRIOR TO THE <br />EXECUTION OF THE WORK OR ORDERING ANY MATERIALS. NO <br />ADDITIONAL COSTS SHALL BE WARRANTED WITHOUT A CHANGE TO THE <br />PROJECT SCOPE. <br />W. EXISTING ROOF WARRANTIES MUST REMAIN INTACT. <br /> <br /> <br />3. WORK INCLUDED/SCOPE OF WORK <br /> <br />A. WORK INCLUDES ALL ENGINEERING, DESIGN, MATERIALS, LABOR, <br />EQUIPMENT, ELECTRIC PANELS, BREAKERS, SERVICES, PERMITS, AND <br />INCIDENTALS NECESSARY TO INSTALL COMPLETE PHOTOVOLTAIC (PV) <br />SYSTEM AS SPECIFIED HEREINAFTER, INCLUDING, BUT NOT LIMITED TO, <br />THE WORK INCLUDED IN THIS SPECIFICATION. <br />B. B. SCOPE OF WORK SHALL SPECIFICALLY INCLUDE RETAINING A <br />PROFESSIONAL ENGINEER FOR FINAL SEALED PV DRAWINGS BASED ON <br />SPECIFIC SUBMITTAL EQUIPMENT. THIS SHALL BE AT THE CONTRACTOR'S <br />EXPENSE. <br />C. PRE AND POST INSTALLATION STRUCTURAL ENGINEER APPROVAL <br />LETTERS FOR THE MODULE MOUNTING SYSTEM, IF REQUIRED BY THE AHJ, <br />ARE THE RESPONSIBILITY OF THE CONTRACTOR. <br />E. THE SYSTEM SHALL BE DESIGNED TO MEET ALL LOCAL SEISMIC AND <br />WIND LOAD REQUIREMENTS. <br />F. ALL PERMITS AND SUBMITTALS REQUIRED BY LOCAL BUILDING <br />COMMISSIONS, AND LOCAL UTILITY. <br />G. ALL NATIONAL AND LOCAL ELECTRIC AND BUILDING CODE <br />REQUIREMENTS SHALL BE MET. <br />H. ALL APPLICABLE ENVIRONMENTAL REGULATIONS SHALL BE MET. <br />I. THE CONTRACTOR SHALL PROVIDE ALL MATERIAL AND LABOR AS <br />REQUIRED TO COMPLY WITH THE LOCAL UTILITY REQUIREMENTS AND <br />STANDARDS EVEN WHEN NOT SHOWN ON THESE PLANS. <br /> <br />4. WARRANTIES <br /> <br />Docusign Envelope ID: CF064D56-F89A-8651-8229-D168AFF8B909
The URL can be used to link to this page
Your browser does not support the video tag.