Browse
Search
2026-145-E-AMS-Cate Associates Inc. dba Yes Solar Solutions- Cedar Grove Community Center Solar Installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-145-E-AMS-Cate Associates Inc. dba Yes Solar Solutions- Cedar Grove Community Center Solar Installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 1:32:57 PM
Creation date
5/13/2026 1:29:00 PM
Metadata
Fields
Template:
Contract
Date
4/22/2026
Contract Starting Date
4/22/2026
Contract Ending Date
4/29/2026
Contract Document Type
Contract
Amount
$139,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVDESCRIPTIONPREPCHECKDATEPANELCLAW, INCALL INFORMATION CONTAINED WITHIN THISDOCUMENT IS PROPERTY OF PANELCLAW, INC.THE PURPOSE OF THIS DOCUMENT IS TOFACILITATE THE INSTALLATION OF PANELCLAWSOLAR PHOTOVOLTAIC MOUNTING SYSTEMS. DONOT COPY OR DISTRIBUTE WITHOUT PERMISSION. <br /> C <br />SCALE: <br />0"1/2"1"2" <br />ORIGINAL SIZE 36"X24" <br />SHEET SIZE ARCH "D" <br />1600 OSGOOD ST. SUITE 2023 <br />NORTH ANDOVER, MA 01845 <br />TEL: 978.688.4900 <br />www.panelclaw.com <br />STAMP: <br />PREPARED FOR: <br />PROJECT: <br />LOCATION: <br />REVISION:SHEET: <br />8 7 6 5 4 3 2 1 <br />8 7 6 5 4 3 2 1 <br />SHEET TITLE: <br />A <br />B <br />C <br />D <br />A <br />B <br />C <br />D <br />RACKING CONSTRUCTION SET <br />SCALE: <br />A <br />RACKING CONSTRUCTION SET <br />ARRAY 1.1 ROOF <br />INFORMATION <br />ROOF HEIGHT (FT)20.00 <br />PARAPET HEIGHT (FT) 0.0 <br />ROOF TILT (DEG) 1 <br />ROOF TYPE TBD <br />SPECIFICATIONS <br />NUMBER OF MODULES 60 <br />MODULE POWER (W) 595 <br />ARRAY OUTPUT (Kw) 35.7 <br />ARRAY AZIMUTH 169 <br />PART QUANTITIES <br />ITEM QTY <br />Base 132 <br />Module Connector 120 <br />Rail 175 <br />Cam 120 <br />Cam Claw 120 <br />Deflector 60 <br />Ballast Block 156 <br />Mechanical Attachment 2 <br />LOADING DETAILS <br />SINGLE MODULE WT (LB) 72.1 <br />SINGLE CMU WT (LB) 32.6 <br />TOTAL ARRAY WT (LB) 10442 <br />ARRAY AREA (SQ. FT)2158 <br />ARRAY LOAD (PSF) 4.84 <br />NOT APPROVED FOR CONSTRUCTION <br />Pisgah Energy Inc <br />Orange County - Cedar <br />Grove Community Center <br />5800 NC-86, Hillsborough, <br />NC 27278, USA <br />BALLAST LAYOUT - 1.1 <br />PC-80 <br />25.08.26.0 v3.0.9406.3.5 CM <br />BALLAST LAYOUT - 1.1 <br />PC-8 0Initial LayoutAW2025-09-151/6" = 1'-0" <br />54 <br />3 <br />4 <br />3 <br />3 <br />1 <br />1 <br />3 <br />3 <br />1 <br />1 <br />3 <br />3 <br />2 <br />3 <br />2 <br />1 <br />1 <br />3 <br />7 <br />1 <br />1 <br />4 <br />4 <br />1 <br />1 <br />4 <br />4 <br />1 <br />1 <br />1 <br />7 <br />4 <br />3 <br />2 <br />4 <br />3 <br />4 <br />4 <br />3 <br />1 <br />4 <br />4 <br />2 <br />2 <br />6 <br />4 <br />2 <br />3 <br />4 <br />46 <br />62.16' <br />37.60' <br />ASSEMBLY QUANTITIES <br />ASSEMBLY QTY <br />NORTH ASSEMBLY 10 <br />SOUTH ASSEMBLY 10 <br />MIDDLE ASSEMBLY 98 <br />NORTH SOUTH ASSEMBLY 2 <br />Docusign Envelope ID: CF064D56-F89A-8651-8229-D168AFF8B909
The URL can be used to link to this page
Your browser does not support the video tag.