Browse
Search
2026-145-E-AMS-Cate Associates Inc. dba Yes Solar Solutions- Cedar Grove Community Center Solar Installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-145-E-AMS-Cate Associates Inc. dba Yes Solar Solutions- Cedar Grove Community Center Solar Installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 1:32:57 PM
Creation date
5/13/2026 1:29:00 PM
Metadata
Fields
Template:
Contract
Date
4/22/2026
Contract Starting Date
4/22/2026
Contract Ending Date
4/29/2026
Contract Document Type
Contract
Amount
$139,844.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE SUBMISSION OF THIS DRAWING ACKNOWLEDGES THIS IS THE FINALDESIGN AND ANY CHANGE TO THIS DIAGRAM COULD RESULT IN AMATERIAL MODIFICATION BY THE STATE INTERCONNECTION STANDARDS.ANY CHANGES TO THIS DIAGRAM MUST BE SUBMITTED TO DUKE ENERGYPROGRESS.COMMON GRND BUSFUSES FOR INTERNALPROTECTION ONLYGSTRING = 23 PV MODULES(1) MODULE PER OPTIMIZERGDC SINGLE LINE DIAGRAM - INVERTER #11NOT TO SCALESTRING = 23 PV MODULES(1) MODULE PER OPTIMIZERDC COMBINER ORJ-BOX, TYPICALINPUTOUTPUTNOTES:1.BOND ALL GROUNDS TOGETHER.2.ALL HALFTONE ITEMS ARE EXISTING TO REMAIN.3.PV DISCONNECT SHALL BE LOAD BREAK RATED, LOCKABLE IN THE OPEN POSITION,WITHIN SIGHT OF THE UTILITY METER, AND READILY ACCESSIBLE TO UTILITYPERSONNEL.AC SINGLE LINE DIAGRAM3NOT TO SCALE60A-3PPOINT OF SOLAR INTERCONNECTIONPROVIDE AND INSTALL NEW 200A-3PBREAKER IN EXISTING SPACE OF PANEL'MDP'DUKE FIGURE 72B, OPTION BEXISTING PRIMARY SERVICE BY DUKE ENERGY PROGRESS~EXISTING SERVICE FEEDER60A-3PDCACINVERTER #117.3 KWDCACINVERTER #217.3 KWREFER TO DC SINGLE LINE DIAGRAMGGNEXISTING SERVICE GROUND60A-3PDCACINVERTER #317.3 KWPANEL 'PV'200A, 208/120V, 3ΙΈ, 3W, NEMA 3RTO 60A-3P BREAKER IN ACCOMBINER. REFER TO ACSINGLE LINE DIAGRAM.PV MODULE:SEG-595-BTA-BGMODULE QUANTITY:137PV MODULE WATTAGE:595 WINVERTER:SOLAREDGE SE17.3KINVERTER QUANTITY:3OPTIMIZER:SOLAREDGE C651UOPTIMIZER QUANTITY:137DC SYSTEM SIZE:81.52 KWAC SYSTEM SIZE:51.9 KWPV SYSTEM SUMMARYEXISTINGPAD MOUNTED UTILITYTRANSFORMER208Y/120V-3PH500KVAEXISTING SWITCHBOARD 'MSB'2000A MLOEXISTING UTILITY METERACCOUNT #: 910036593666METER #: 77597383M200A/NFAC DISCONNECTNEMA 3RG17.3KW INVERTERCOMMON GRND BUSFUSES FOR INTERNALPROTECTION ONLYGSTRING = 22 PV MODULES(1) MODULE PER OPTIMIZERGDC SINGLE LINE DIAGRAM - INVERTERS #2,32NOT TO SCALESTRING = 23 PV MODULES(1) MODULE PER OPTIMIZERINPUTOUTPUTTO 60A-3P BREAKER IN ACCOMBINER. REFER TO ACSINGLE LINE DIAGRAM.17.3KW INVERTEREXISTING PANEL 'MDP'1200A MLOGDC COMBINER ORJ-BOX, TYPICALWILDE #: 25-246THIS DRAWING IS AN INSTRUMENT OF SERVICE. THE DRAWING AND THE INFORMATION THEREON IS THE PROPERTY OF WILDE ENGINEERING, PLLC ANY REPRODUCTION, ALTERATION, OR USE FOR OTHER THAN THE INTENDED PROJECT, WITHOUT THE WRITTEN CONSENT OF WILDE ENGINEERING, PLLC IS EXPRESSLY FORBIDDEN. COPYRIGHT © WILDE ENGINEERING PLLC 2026, ALL RIGHTS RESERVED.01/26/2026REVISIONSNo.DescriptionDateSEALBID DOCUMENTSWilde EngineeringCopyright 2026-BID DOCUMENTS01/26/2026CEDAR GROVE <br />COMMUNITY CENTER <br />SOLAR PV PROJECT <br />5800 HWY 86 N. <br />CEDAR GROVE, NC 27278 BID DOCUMENTS ONLYNOT FOR CONSTRUCTIONSYSTEM OWNER: ORANGE COUNTY NORTH CAROLINASINGLE LINE DIAGRAME-201Docusign Envelope ID: CF064D56-F89A-8651-8229-D168AFF8B909
The URL can be used to link to this page
Your browser does not support the video tag.