Browse
Search
Minutes 04-14-2026-Work Session
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2020's
>
2026
>
Minutes 04-14-2026-Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 10:08:21 AM
Creation date
5/6/2026 10:06:19 AM
Metadata
Fields
Template:
BOCC
Date
4/14/2026
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda 04-14-2026; 1 - Durham Tech Presentation
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
Agenda 04-14-2026; 10 - Parks and Recreation Council – Appointments Discussion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
Agenda 04-14-2026; 2 - Discussion on 2026 Longtime Homeowner Assistance Program
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
Agenda 04-14-2026; 3 - Draft Orange County Trails Plan
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
Agenda 04-14-2026; 4 - Potential Removal of Boards and Commissions Members Due to 2025 Attendance
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
Agenda 04-14-2026; 5 - Advisory Board on Aging – Appointments Discussion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
Agenda 04-14-2026; 6 - Animal Services Advisory Board – Appointment Discussion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
Agenda 04-14-2026; 7 - Board of Health – Appointments Discussion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
Agenda 04-14-2026; 8 - Human Relations Commission – Appointments Discussion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
Agenda 04-14-2026; 9 - Orange Water and Sewer Authority Board of Directors – Appointment Discussion
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
Agenda for April 14, 2026 Work Session
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> documents like the 2030 Parks and Recreation Master Plan and the Mountains to Sea Trail route adoption <br /> (2018), a formal trails plan for the County has not existed. <br /> A Request for Proposals was developed in the summer of 2024 and issued in September of that year. <br /> Gensler was selected as the consultant to prepare the plan, and the contract was awarded at the Board's <br /> Business meeting on December 10, 2024.As shown in the attached draft plan, project work got underway <br /> with a project kickoff in January 2025 including the consultant,staff and the Parks and Recreation Council, <br /> which serves as the steering committee for the Plan. <br /> In March 2025, GIS mapping and data analysis began, including review of prior plan efforts and on-site <br /> field visits to a number of potential trail locations based on preliminary assessments(summarized on page <br /> 14 of the draft plan and this process is also discussed in more detail in Sections 1-3 of the attached draft <br /> Plan.) <br /> Project goals were created from opportunities and challenges discussions held by the Parks and Recreation <br /> Council in early 2025. Five (5) project goals were identified: <br /> 1. Spark enthusiasm for county trail connectivity with an equitable, inclusive and engaging <br /> outreach process. <br /> 2. Develop a Trails Plan that reflects the community's vision and aligns with other County and <br /> municipality efforts, such as the Bicycle and Pedestrian Plan (currently underway). <br /> 3. Create a comprehensive network of connectivity between key points of interest including <br /> work, home, school, commerce and public transit. <br /> 4. Expand access to excellent parks and recreation opportunities for a broader population, <br /> especially in the rural areas of the county. <br /> 5. Identify new and existing connections to complete the Mountains to Sea Trail (MST) segment <br /> in Orange County. <br /> A process for public outreach and engagement is outlined in Section 3 of the draft Plan. This included a <br /> project webpage, e-newsletters, social media campaigns, digital display graphics and flyers at parks, <br /> among other efforts. Two (2) rounds of public engagement workshops were held in May and September <br /> of 2025, with accompanying online surveys that allowed participants to take in the workshop experience <br /> and provide feedback. Pop-up events were also held to try and reach out to other members of the public. <br /> Respondents and attendees provided information about current use of trails and parks, points of interest <br /> to be connected, and aspirational design vision. Individuals were also asked to prioritize different trail <br /> possibilities and react to an initial prioritization created from the workshops, surveys,on-site analysis and <br /> prior plans. <br /> Note: Coordination with the staff and consultant for the ongoing Bicycle and Pedestrian Plan was built <br /> into the Trails Plan effort as well. Staff and consultants participated in a joint workshop and both were <br /> present at a community outreach event.The Bicycle and Pedestrian Plan is continuing and will be coming <br /> to the Board later this year, and efforts to ensure consistency will be included. <br /> From the work done throughout 2025, a set of six (6) guiding principles were determined reflecting <br /> recurring themes from public engagement, meetings with the steering committee and alignment with <br /> guiding plans.These are (as shown on page 38 of the Plan): <br />
The URL can be used to link to this page
Your browser does not support the video tag.