Orange County NC Website
3 <br /> [Departmental Use Only] <br /> TITLE SHSC Solar <br /> FY 2025-2026 005478 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 8th day of <br /> May, 2026, by and between 8Msolar LLC, (hereinafter called the "Contractor"), and Orange County, a <br /> political subdivision of the State of North Carolina, (hereinafter called the "County," "Orange County," or <br /> "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by Pisgah Energy (Sheet Bid Documents E-002, E101, E201, <br /> E301, E302, PC-1, PC-2, PC-3, PC-4, PC-5, PC-6, PC-7, PC-8, PC-9, PC-10 dated <br /> 02/16/2026) <br /> b. Written specifications prepared by the Designer. <br /> c. 8Msolar LLC proposal dated March 30, 2026 which fully describes the work to be performed, <br /> Revised 01/24 1 <br />