Browse
Search
Agenda - 05-20-2003-8s
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 05-20-2003
>
Agenda - 05-20-2003-8s
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 9:09:52 PM
Creation date
8/29/2008 10:46:58 AM
Metadata
Fields
Template:
BOCC
Date
5/20/2003
Document Type
Agenda
Agenda Item
8s
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />normally located in the `A' building have "doubled up" in `B' building offices, including several <br />offices "on loan" from the Health Department while `A' building renavations are completed, and <br />others have been temporarily relocated to the Southern Human Services Center. A temporary <br />"mini Library" has been established in the modular building on the former Orange Industries <br />building site, with the majority of books having been placed in storage during this phase of the <br />renovations. Housing and Community Development staff have also been stationed in the <br />modular building. <br />As in the `B' building, the scope of work includes replacement of the entire HVAC system, <br />acoustic the ceilings and lights, installation of new data lines, replacement of flooring and <br />painting. <br />As acoustical the ceiling was removed in REWHS A Building, the contractor discovered hidden <br />conditions which requires additional repairs. These conditions include the removal of load <br />bearing support walls, columns and structural members. The majority of these conditions <br />originate from the 1978 renovation project. Additionally there are some fire code/life safety <br />issues that must be addressed. Public Works is working with the inspections department, the <br />fire marshal and the consulting engineer to determine the scope of the repairs and the <br />associated cost. <br />C:\WINDOWS\TEMP\REWHS Update 05-15-03.doc 4 Printed: 05/16/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.