Browse
Search
Agenda - 05-20-2003-8s
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 05-20-2003
>
Agenda - 05-20-2003-8s
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 9:09:52 PM
Creation date
8/29/2008 10:46:58 AM
Metadata
Fields
Template:
BOCC
Date
5/20/2003
Document Type
Agenda
Agenda Item
8s
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DSS staff were primarily relocated to the `A' building basement and Southern Human Services <br />Center. <br />The scope of work for the `B' building included replacement of the existing HVAC system, <br />replacement of acoustic the ceilings and lights, painting and replacement of data lines on all <br />three floors. On the First and Second floors, wood tongue and groove flooring was refinished <br />in several office areas, while rubber the was installed in corridors. Rubber floor the and sheet <br />vinyl designed for medical facilities was installed throughout the basement level (clinic area). <br />In addition, the Health Department incorporated significant modifications to the clinic area, <br />including creation of new exam rooms and offices and improvements in others. Installation of <br />anew high-density file system for DSS was also incorporated into the renovation project. <br />Simultaneously with `B' building renovations, the cooling tower was replaced with a new chiller <br />for provision of cooled air throughout the complex. The new chiller was brought on-line in April <br />2003 and is providing cooling for the Recreation and `B' buildings. <br />Work in the `B' Building has also now been completed with the exception of minor "punchlist" <br />items, with Health and DSS reoccupying the building in the first weeks of May 2003. <br />The scope of work for the `B' building renovations had to be expanded once ceilings were <br />removed and non-compliant items (structural and fire code related) were exposed. Other <br />changes were identified by the Inspections department and the fire marshal related to modern <br />fire code, life safety and Americans with Disabilities Act (ADA) compliance (fire doors, <br />handrails in stairwells, etc.). The cost of these repairs was approximately $100, 000. <br />CURRENT STATUS <br />The contractors have moved operations to the `A' building as it was vacated. Health <br />Department administrative staff were returned from the `A' building and other remote locations <br />to their permanent offices in the `B' building. Clinic staff have been returned from the modular <br />clinic to the renovated `B' building clinic. Dental clinic staff will return to the `B' building the <br />week of May 19. DSS staff have been returned from the `A' building. In addition, DSS staff <br />C:\WINDOWS\TEMP\REWHS Update 05-15-03.doc 3 Printed: 05/16/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.