Browse
Search
Agenda - 05-20-2003-8s
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 05-20-2003
>
Agenda - 05-20-2003-8s
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 9:09:52 PM
Creation date
8/29/2008 10:46:58 AM
Metadata
Fields
Template:
BOCC
Date
5/20/2003
Document Type
Agenda
Agenda Item
8s
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Work was phased as follows for completion: <br />1. Central Recreation Building <br />2. Boiler replacement <br />3. Richard E. Whiffed `B' Building (Health, DSS) <br />4. Replacement of cooling tower with chiller <br />5. Richard E. Whiffed `A' Building (Library, DSS, Housing & CD, etc.) <br />INTRODUCTION <br />Central Recreation staff were temporarily relocated to space in the basement of the Whiffed `A' <br />building, following relocation of Department on Aging staff to existing DOA facilities, and OPT <br />staff to a modular office building located at the Public Works complex. <br />The scope of work in the Central Recreation building included replacement of the existing <br />HVAC system, as well as air conditioning the gymnasium, which had previously been <br />unconditioned space. All existing acoustic the ceilings and lights were replaced, and some <br />additional lighting was installed, especially on the building exterior. Also included was removal <br />of all asbestos composition floor the (ACT) throughout the building. Lobby and corridor areas <br />and Activity Area 3 were replaced with rubber floor tile. Activity Area 1 was replaced with <br />linoleum the and the office areas were replaced with carpet tile. All areas were painted <br />including the entire gymnasium. <br />Simultaneously with Recreation Building renovations, the boiler located in the mechanical <br />room (`A' building basement), was replaced and brought on-line in November 2000. <br />Work in the Central Recreation Building was completed, and the building reoccupied in <br />December 2002. <br />During the renovations in the `B' building, Health Department staff were relocated to areas in <br />the `A' building basement, a modular health clinic building on the site of the deconstructed <br />former Orange Industries building, leased dental clinic and offices and other remote locations. <br />C:\WINDOWS\TEMP\REWHS Update 05-15-03.doc 2 Printed: 05/16/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.