Orange County NC Website
170 <br /> Major Projects — Projects and Sequencing <br /> . FY2030-31 I FY2031-32 � FY2032-33� <br /> , <br /> Carrboro Design Construction <br /> Chapel Hill- Elementary <br /> Carrboro Estes Hills <br /> City Schools Elementary Design Construction <br /> Frank Porter <br /> p. 133-135 Graham Design Construction Close Out <br /> Elementary <br /> Orange New Elementary Design Construction <br /> County School <br /> Schools Orange Middle Pre-Design <br /> Design Construction Close Out <br /> p. 147-48 Renovation Scope <br /> OCS may not be able to fund third major project due to increased cost of Orange Middle School <br /> • County used the following rules to sequence these plans <br /> - Bonds must be borrowed within 7 years of referendum - FY 2031 . May ask for 3-year extension with LGC. <br /> - Once borrowed, funds must be drawn down for actual expenses within 3 years. <br /> - Funds are allocated between the districts fairly ORANGE CUlJNT11' <br /> 4 N©RTLI CAROLINA <br />