Orange County NC Website
13 <br /> Slide#1 <br /> %6aite <br /> Positively Charming <br /> Slide#2 <br /> A. ■ <br /> ANE WATER RECOURCE AND <br /> RECOVERY FACILITY (WRRF) <br /> CURRENT UPGRADE AND EXPANSION <br /> { a <br /> FROM 2.5 MGD TO 4.0 MGD <br /> xMEETS JORDAN <br /> ",Ira <br /> CROWOER <br /> �ek <br /> 11A <br /> John Dodson explained that the current capacity was 2.5 million gallons while the new facility <br /> would provide 4 million gallons with expansion capability to 6 million. The new facility was scheduled to <br /> come online in late 2027 or early 2028 at approximately $90 million cost and would meet Jordan Lake <br /> requirements. <br />