Orange County NC Website
TRANSIT: PERFORMANCE MEASURES <br /> 40 2020 Base 18 205 E+C 2055 MTP <br /> 0. 5 <br /> 0. 0 <br /> The Destination 2055 anticipates per capita <br /> transit ridership to increase from 0.15 to 0.31 by <br /> 0.25 <br /> 2055. <br /> 0.20 <br /> a <br /> 0 0.15 <br /> 0 <br /> 0.10 - <br /> 0.17 <br /> 0.0 <br /> 0.00 <br /> 2020 Base 2055 E +C 2055 MTP <br /> Reference: A endix 16, Table A16.7b scenario <br /> pp <br />