Orange County NC Website
TRANSIT.* PERFORMANCE MEASURES <br /> 2020 Base 2055 E+C 2055 MTP <br /> 0 <br /> 0-1 <br /> The Destination 2055 anticipates transit mode <br /> share to grow from 2.6% in 2020 to 5.1% in 2055 . <br /> 0 <br /> 10 4 <br /> 0 <br /> W <br /> (D <br /> o 3 <br /> 0 <br /> CD • <br /> � 1 <br /> a <br /> C) <br /> 0 <br /> 020 Base 20 E +C 2055 MTP <br /> Reference: A end ix 16, Table A16.7b Scenario <br /> pp <br />