Orange County NC Website
TRANSIT: <br /> 5,000 <br /> Destination 2055 includes the anticipated 41000 <br /> costs (in Millions) of projects and/or <br /> services by and the year of expenditure. � <br /> 0 <br /> 31000 <br /> c <br /> 0 21000 <br /> U <br /> i,aoo <br /> 0 <br /> 2026-2035 2036-2045 2046-2055 <br /> Reference: Appendix 11 , Table A11.5 Year of Expenditure <br />