Orange County NC Website
DESTINATION • <br /> 2055 , <br /> THE PROCESS <br /> 3 <br /> VISIONING ALTERNATIVES PREFERRED ADOPTION <br /> ANALYSIS OPTION <br /> Goals and objectives were Existing transportation Fiscal constraint was finalized, <br /> determined here. This step conditions are reviewed, Analyzed fiscal feasibility and modeling data was provided, <br /> informs what performance future issues are assessed, and selected Preferred Option for and the plan underwent air <br /> measures will be tracked, and alternative scenarios are Y like) land use and selection of quality review to determine <br /> guide land use scenarios and projects. projects over time will not harm <br /> project selection. considered. Pro the air quality. <br /> January of Spring of 2025 Fall of Adopted in February 2026 <br /> 2024 2025 <br />