Orange County NC Website
30 <br /> SIEMENS <br /> Inclusions <br /> 1. Freight <br /> 2. Engineering <br /> 3. Project Management for Siemens Scope of work <br /> 4. System Commissioning and Final Pretest <br /> 5. Final AHJ Testing and certification <br /> 6. Fire Alarm Submittal to customer <br /> 7. Fire Alarm Permit or Electrical Permit or costs associated with this project. <br /> 8. Professional Engineers stamp which may be required <br /> 9. Bonding <br /> 10. Supply or installation of any electrical conduits, cables, wiring or back boxes, and equipment <br /> 11. As interpreted in the specifications, as shown on drawings, and as defined in this proposal <br /> 12. Price is based on Auto-CAD electronic drawings for the project being supplied to us by others <br /> 13. DACT <br /> 14. One (1) year warranty <br /> 15. New Fire Alarm Cabling <br /> 16. Demo of existing Fire Alarm System <br /> 17. Final wiring terminations to the control panel <br /> 18. Fire Caulk <br /> 19. Electronic (PDF) submittals <br /> 20. Electronic (PDF) O&M manuals <br /> 21. Pt. Id Programming <br /> 22. Customer Training - 1 hour <br /> 23. Overtime 8 hours. <br /> 24. Rath AOR- Bldg. A only <br /> 25. Smart Sprinkler Monitoring > dedicated 120v power from breaker. <br /> 26. Fire Manager> Bldg. X > Cloud Gateway <br /> Page 5 of 11 <br />