Orange County NC Website
20 <br /> SIEMENS <br /> Exclusions <br /> 1. Offsite system monitoring fees <br /> 2. Cost associated with multiple trips to the job site due to incompletion by others <br /> 3. Working in areas containing hazardous materials or confined space <br /> 4. Cost associated with schedule acceleration or multiple unplanned phases <br /> 5. Telephone line for DACT and/or IP Network Connection <br /> 6. Costs associated with bypassing the system during construction <br /> 7. Building and construction permit fees <br /> 8. Creating base building auto cad drawings for the project <br /> 9. Ceiling and/or wall removal, replacement, patching, and painting <br /> 10. Per project aggregate general liability insurance <br /> 11. Overtime <br /> 12. After hours work <br /> 13. Additional testing due to others <br /> 14. Dedicated phone lines <br /> 15. Dedicated IP Network Drop <br /> 16. Sales tax will not be included on the invoice unless Siemens receives a completed NCDOR E589CI <br /> 17. Conduit raceway, Electrical boxes and supports <br /> 18. External NAPCO antenna <br /> 19. Special insurance <br /> 20. Remote monitoring related services <br /> 21. Scaffolding and lifts <br /> 22. Knox box <br /> 23. Shunt trip breakers <br /> 24. Security system interface or door lock release <br /> 25. Back boxes for devices are not included unless listed in this proposal's provided equipment list <br /> 26. Fire Watch or other costs associated with temporary measures while the system is down or impaired (one <br /> week expected downtime) <br /> Page 6 of 11 <br />