Browse
Search
Agenda 04-21-2026; 8-e - Services Contract Award for Animal Services and Whitted Complex Fire Alarm Systems Replacement
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 04-21-2026 Business Meeting
>
Agenda 04-21-2026; 8-e - Services Contract Award for Animal Services and Whitted Complex Fire Alarm Systems Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2026 11:27:36 AM
Creation date
4/16/2026 11:23:38 AM
Metadata
Fields
Template:
BOCC
Date
4/21/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for April 21, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-21-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> SIEMENS <br /> Scope of Work <br /> Siemens is pleased to present a one-for-one Fire Alarm System field device migration for the OC Animal <br /> Services Fire Alarm Migration — Project 44OP. The scope of work includes the replacement of one (1) Fire <br /> Alarm Control Panel, two (2) booster panels, one (1) NAPCO cellular communicator, one (1) smart sprinkler <br /> panel, one (1) Building X Cloud Gateway, and a non-voice NAC circuit & remote annunciator. <br /> The system design and device quantities are based strictly on the AHJ-stamped, approved construction <br /> drawings and reflect a one-for-one replacement of existing fire alarm field devices to include two (2) CO <br /> detectors and 1 chime/strobe. <br /> Any additions, deletions, or modifications beyond this approved design shall be considered outside the base <br /> scope and will be addressed via a change order. <br /> Project Duration: May 2026 to September 30, 2026. <br /> Any field changes that deviate from the AHJ-approved drawings as a result of site conditions, owner <br /> requests, or regulatory requirements shall constitute a change order to Siemens Industry, Inc. Please refer to <br /> the Inclusions, Exclusions, Clarifications, and Bill of Materials included in this proposal for further definition of <br /> the project scope. <br /> Page 4 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.