Browse
Search
Agenda 04-14-2026; 3 - Draft Orange County Trails Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 04-14-2026 Work Session
>
Agenda 04-14-2026; 3 - Draft Orange County Trails Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2026 2:46:49 PM
Creation date
4/9/2026 3:08:11 PM
Metadata
Fields
Template:
BOCC
Date
4/14/2026
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Agenda for April 14, 2026 Work Session
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-14-2026 Work Session
RES-2026-026-A Resolution of the Orange County Board of Commissioners Opposing Modifications to County property Tax Authority
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
59 <br /> [§JMebane to Kings Highway Park <br /> Segment 6B (alternate 2 of 3) delivers a natural-surface trail within/adjacent to the Duke Energy transmission <br /> easement, creating a quiet access between Mebane to Kings Highway Park. <br /> PROJECT OVERVIEW Relevant Community Needs: <br /> Location Quiet, low-impact off-road option parallel to <br /> From Mebane toward the Town of Hillsborough's road network <br /> Kings Highway Park, along a Duke Energy • Recreation facility access without a car <br /> transmission corridor and through wooded areas • Predictable routing through a long, continuous <br /> and open utility clearings adjacent to residential utility corridor <br /> spaces; exact alignment and endpoints to be <br /> confirmed through inter-agency and utility partner Required Structures&Crossings: <br /> coordination Localized boardwalks or elevated tread in low, <br /> wet areas (e.g., crossing at the Eno River) <br /> Key Connections • Sightline management and vegetation clearing <br /> • Residential areas in the City of Mebane within the utility corridor <br /> • Kings Highway Park • Wayfinding at access points and transitions <br /> into residential areas <br /> Total Length <br /> -8 miles (planning length) Potential Constructability Challenges: <br /> • Transmission clear-zone requirements and <br /> Trail Type potential need for switchbacks <br /> • Natural-surface trail (gravel/aggregate) • Privacy considerations near adjacent homes <br /> • 8 ft typical width where the corridor narrows <br /> • Coordination with Duke Energy and approval <br /> on potential use of transmission line corridor <br /> • Compliance with utility owner conditions <br /> ALIGNMENT WITH ORANGE COUNTY STRATEGIC PLAN <br /> Environmental Protection ✓ Reuses a utility corridor to reduce new land <br /> & Climate Action disturbance <br /> Provides quiet, restorative, off-road access to Kings <br /> Healthy Community ✓ Highway Park <br /> Housing for All Indirect Benefit Serves nearby neighborhoods with a low-impact <br /> nature route <br /> Offers an off-road alternative parallel to regional <br /> Multi-modal Transportation ✓ roadways <br /> Public Education/ ✓ Supports informal learning through access to <br /> Learning Community natural areas <br /> Diverse &Vibrant Economy ✓ Encourages park visitation and local recreation- <br /> based spending <br /> S6 Draft Orange County Trails Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.