Orange County NC Website
Strategic conversations with and Recre on <br /> Council (PRC) to n a ement process, seek <br /> feedback on outr ach methods, an pr on <br /> project progress <br /> Two hands-on sessions n May with interactive activities <br /> including co unity oints1of interest boards, current <br /> ��rr�ag}ping i onnection drawing, aspirational <br /> ° ` 7 d it ut, and vision statement mad-libs <br /> �4Y <br /> 1' Onli j _ icating vision workshop_activities to �� � _ - mow, �r <br /> broa a ieipation in the devJopment of the project .I <br />' goals orities, and countywide vision for trail connectivity <br /> Two open- <br /> provide feedback on ing principles ose , <br /> trail segment prioritizat <br /> °' �_ '•�' -gin.,u;,,.....;,� <br /> TabUa.g events at the County Roadshow and enter to <br /> bring Draft Network Workshop content out in <br /> for residents who may no ve been able tootten <br /> / J <br /> � Netwo k <br /> 111 � ►j►l��r e <br /> We!>-based survey replicating aft Network Workshop content <br /> to provide a virtual alternat' e to the in-person workshops and <br /> ensure residents could p vide feedback on the proposed trail <br /> network and priority rankings <br /> Draft Orange County Trails Plan 25 <br />