Browse
Search
2026-120-E-County Mgr-Red Hawk Farm-Renewable Energy Infrastructure for the Future of Farms
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-120-E-County Mgr-Red Hawk Farm-Renewable Energy Infrastructure for the Future of Farms
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2026 9:38:09 AM
Creation date
4/9/2026 9:35:14 AM
Metadata
Fields
Template:
Contract
Date
3/3/2026
Contract Starting Date
3/3/2026
Contract Ending Date
3/9/2026
Contract Document Type
Contract
Amount
$30,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Sustainability Powered by Submittable <br />Title Renewabl e Energy Infrastructure for the <br />Future of Farms <br />by Linden Thayer in 2026 Orange County Community Climate <br />Action Grant Application <br />linden@redhawkfarmnc.com <br />08/15/2025 <br />id. 51368506 <br />Post Award - New Vendor 01/26/2026 <br />Score n/a <br />W -9 Document Access a fillable W -9 here. Complete it and upload below. <br />W -9 File Upload <br />Red_Hawk_Farm_W9.pdf <br />Electric Funds Transfer <br />(EFT) Form <br />Access a fillable EFT here. Complete it and upload below. <br />EFT File Upload <br />OC_EFT_-_Direct_Deposit_Form_RHF1.pdf <br />Certificate of Liability <br />Insurance <br />A copy of the applicant organization’s current certificate, from the organization’s insurance carrier. <br />Table 1 below outlines insurance types and minimums required, for each jurisdiction. If exempt <br />from W orker’s Compensation compliance, include a statement explaining why, with the applicant <br />organization’s application materials. NOTE: Proof of insurance is not required at the time of <br />application submission. If your agency is approved for funding, documentation of insurance must <br />be provided to the jurisdiction awarding the funding when the contract is awarded. The insurance <br />certificate should reflect the funding jurisdiction as an additional insured party and certificate holder <br />and provide coverage for the duration of the funding period (two years, beginning as early as <br />October 1, 2024). If proof of insurance can only be written for one year, an update will be required <br />for all ongoing projects. Renewal certificates must be sent to the jurisdiction 30 days prior to any <br />expiration date, cancellation or modification of any stipulated insurance coverage. NOTE: Upon <br />request, insurance requirements may be reviewed on a case by case basis by the County. Please <br />contact the staff identified on the Submission Requirements on Page 12 if you have questions or <br />would like to request a review of your insurance requirements. <br />Certificate of Liability Insurance File Upload <br />6b84ae6a-0f21-4c48-9cd4-daa0f63e2ac3.pdf <br />Forms of Liability Insurance and Minimum Policy Amounts Required <br />Table 1. Forms of Liability Insurance and Minimum Policy Amounts Required.xlsx <br />I verify that the <br />information submitted is <br />accurate and true. <br />checked <br />Original Submission 08/15/2025 <br />Score n/a <br />Docusign Envelope ID: 1EDD1EF6-0E3A-40E1-B431-94002662BCDF
The URL can be used to link to this page
Your browser does not support the video tag.