Browse
Search
2026-109-E-AMS-Brady Trane Service-Whitted Building Chiller & CHW Pump Install
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-109-E-AMS-Brady Trane Service-Whitted Building Chiller & CHW Pump Install
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2026 9:42:14 AM
Creation date
4/9/2026 9:28:16 AM
Metadata
Fields
Template:
Contract
Date
3/10/2026
Contract Starting Date
3/10/2026
Contract Ending Date
3/11/2026
Contract Document Type
Contract
Amount
$793,025.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />808 Aviation Parkway, Suite 1100, Morrisville, NC 27560 – Tel: 866.328.2764 – bradyservices.com <br />Page 4 of 5 <br /> (2) Chilled Water Differential Pressure <br /> BACnet MS/TP integration to Chiller Control Panel (Chiller to be <br />provided with BACnet communications enabled) <br /> BACnet MS/TP integration to (3) Pump VFD Interface (Siemens <br />shall provide VFDs with BACnet communications enabled) <br /> <br />Implement control sequences: <br /> Enable/disable based on system demand <br /> Chilled water temperature reset logic <br /> Lead/lag if multiple chillers exist <br />o Test all alarms and interlocks. <br /> <br /> <br />Scope of Work – Chilled Water Pump Replacement <br />1. Mechanical <br /> Remove existing chilled water pumps. <br /> Install new pumps with VFDs, suction diffusers, triple-duty valves, and flexible <br />connectors. <br /> Grout pump bases and align shafts. <br /> Insulate piping and provide heat trace if required. <br /> Label piping per ANSI standards. <br /> <br />2. Electrical <br /> Provide power to new pump motors and VFDs. <br /> Install disconnect switches and verify grounding. <br /> Test voltage and rotation before start-up. <br /> <br />3. Controls <br /> Integrate pumps into BAS for: <br />o Start/stop, speed control, DP reset logic. <br /> Configure lead/lag sequencing. <br /> Install pressure sensors for differential pressure control. <br /> Test alarms and interlocks. <br />Docusign Envelope ID: 8E7F8A38-088B-4CBD-BB93-D9B5A5272522
The URL can be used to link to this page
Your browser does not support the video tag.