Browse
Search
2026-109-E-AMS-Brady Trane Service-Whitted Building Chiller & CHW Pump Install
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-109-E-AMS-Brady Trane Service-Whitted Building Chiller & CHW Pump Install
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2026 9:42:14 AM
Creation date
4/9/2026 9:28:16 AM
Metadata
Fields
Template:
Contract
Date
3/10/2026
Contract Starting Date
3/10/2026
Contract Ending Date
3/11/2026
Contract Document Type
Contract
Amount
$793,025.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />808 Aviation Parkway, Suite 1100, Morrisville, NC 27560 – Tel: 866.328.2764 – bradyservices.com <br />Page 3 of 5 <br />o Disconnect and remove existing chiller load side power and control wiring. <br />o Reuse existing disconnect. <br />o Disconnect pumps P-1,2,5 <br /> <br /> Installation <br />o Install new VFD’s for pumps P-1,2,5 and wire <br />o Reconnect pumps P-1,2,5 from load side of VFD’s <br />o Provide new load side power feed from panel to chiller per manufacturer’s <br />requirements. <br /> Testing <br />o Verify proper rotation and voltage before energizing chiller. <br /> <br />3. Controls <br /> Demolition <br />o Remove old control wiring and sensors associated with previous chiller. <br /> Installation <br />o Integrate new chiller into BAS via BACnet/IP or Modbus (as specified). <br /> Configure points for: <br /> Siemens BACnet IP PXC Controller with the following points (26 <br />hardwired points, 40 integration points): Chiller Enable <br /> Chiller Status <br /> Chiller Setpoint <br /> Chiller Fault <br /> Chiller Supply Temperature <br /> Primary Pump P-5 Start/Stop wiring (Pump to be started by chiller) <br /> Primary Pump P-5 Status <br /> Primary Pump P-5 VFD Fault <br /> Primary Pump P-5 VFD Speed Control <br /> Primary Pump P-5 VFD Speed Feedback <br /> Building Chilled Water Return Temperature <br /> Building Chilled Water Return Flow <br /> Decoupler Line Temperature <br /> (2) Secondary Pump (P-1 and P-2) Start/Stop <br /> (2) Secondary Pump (P-1 and P-2) Status <br /> (2) Secondary Pump (P-1 and P-2) VFD Fault <br /> (2) Secondary Pump (P-1 and P-2) VFD Speed Control <br /> (2) Secondary Pump (P-1 and P-2) VFD Speed Feedback <br /> Building Chilled Water Supply Temperature <br />Docusign Envelope ID: 8E7F8A38-088B-4CBD-BB93-D9B5A5272522
The URL can be used to link to this page
Your browser does not support the video tag.