Browse
Search
2026-109-E-AMS-Brady Trane Service-Whitted Building Chiller & CHW Pump Install
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-109-E-AMS-Brady Trane Service-Whitted Building Chiller & CHW Pump Install
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2026 9:42:14 AM
Creation date
4/9/2026 9:28:16 AM
Metadata
Fields
Template:
Contract
Date
3/10/2026
Contract Starting Date
3/10/2026
Contract Ending Date
3/11/2026
Contract Document Type
Contract
Amount
$793,025.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />808 Aviation Parkway, Suite 1100, Morrisville, NC 27560 – Tel: 866.328.2764 – bradyservices.com <br />Page 2 of 5 <br />Scope of Work <br />Scope of Work – Chiller Replacement <br />1. Mechanical <br /> Demolition <br />o Disconnect and remove the existing chiller, associated piping, valves, insulation, <br />and supports. <br />o Drain and properly dispose of existing refrigerant per EPA guidelines. <br />o Remove old isolation valves, strainers, and flexible connectors. <br />o Disconnect and remove pumps P-1,2,5 <br /> Installation <br />o Install new chiller on existing or new housekeeping pad (verify structural <br />adequacy). <br /> Chiller not included in the proposal. Owner has already purchased <br />chiller. <br />o Provide vibration isolation pads and anchors. <br />o Connect to existing chilled water supply and return piping; install new isolation <br />valves, strainers, and flexible connectors. <br />o Install new pressure/temperature ports for commissioning. <br />o Insulate all new piping with vapor-sealed insulation and aluminum jacket. <br />o Provide heat trace for exposed piping if required. <br />o Install new condensate drain piping to approved discharge point. <br />o Install new pumps P-1,2,5 <br />o Label all piping per ANSI standards. <br /> Testing <br />o Pressure test piping connections. <br />o Flush and clean chilled water loop before final connection. <br />o Perform leak test on refrigerant circuit. <br />o Complete factory start-up and commissioning. <br /> <br /> <br />2. Electrical <br /> Demolition <br />Docusign Envelope ID: 8E7F8A38-088B-4CBD-BB93-D9B5A5272522
The URL can be used to link to this page
Your browser does not support the video tag.