Browse
Search
2026-094-E-AMS-Siemens Industry-Gateway RTU 2 Controls
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-094-E-AMS-Siemens Industry-Gateway RTU 2 Controls
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2026 9:18:32 AM
Creation date
4/9/2026 9:18:23 AM
Metadata
Fields
Template:
Contract
Date
3/19/2026
Contract Starting Date
3/19/2026
Contract Ending Date
3/20/2026
Contract Document Type
Contract
Amount
$7,800.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br />Siemens will provide the following: <br />•Building Schedule for RTU-02 with unoccupied and occupied periods <br />•PPCL Programming to enable morning warm-up on the RTU <br />◦Table statement for all VAV with an average VAV temperature calculation <br />◦Write average VAV temperature to BACnet object for BMS setpoint on Symbio controller via <br />existing MS/TP wiring <br />◦Upon morning warm-up being enabled by the RTU (change over to occupied state) program all <br />VAV move to max flow <br />◦Upon disabling of the morning warm-up at the RTU program all VAVs damper position is <br />restored to priority 16 and the DXR application to modulate flow based on space heating <br />demand <br />•PPCL Programming to enable daytime warm-up on the RTU <br />◦Table statement for all VAV with an average VAV temperature calculation <br />◦Write average VAV temperature to BACnet object for BMS setpoint on Symbio controller via <br />existing MS/TP wiring <br />◦Upon daytime warm-up being enabled by the RTU (change over to occupied state) program all <br />VAV move to max flow <br />◦Upon disabling of the daytime warm-up at the RTU program all VAVs damper position is restored <br />to priority 16 and the DXR application to modulate flow based on space heating demand <br />•Up to 8 hours on-site support to test conditions with Brady-Trane once new PPCL is provided. <br />•Included in this scope of work are the 2 onsite support visits that was originally determined charged to <br />warranty. When the second trip was made to meet with Brady onsite and troubleshoot the unit it was <br />determined the Trane RTU was not set-up to receive points for control. <br />Exclusions & Clarifications <br />1.Applicable sales taxes as required by law. Sales tax will be billed at the time of invoicing. <br />2.TAB or re-commissioning support in are excluded. <br />3.Revisions to As-Built or any drawings are excluded <br />4.This is a labor only quote. <br />5.Pricing subject to change after 30 days. <br />Page 4 of 8 <br />Docusign Envelope ID: E9281999-7874-4F50-808E-716F648F475B