Browse
Search
2026-092-E-AMS-DC Group-Purchase and Install Static Switch on UPS at WCOB
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-092-E-AMS-DC Group-Purchase and Install Static Switch on UPS at WCOB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2026 9:16:54 AM
Creation date
4/9/2026 9:16:50 AM
Metadata
Fields
Template:
Contract
Date
3/8/2026
Contract Starting Date
3/8/2026
Contract Ending Date
3/16/2026
Contract Document Type
Contract
Amount
$9,437.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Price Quotation <br />Quote Number: 0000977062 <br />Orange CountyTo: <br />Attn: <br />DC Group ID: <br />DC Group Job #: <br />Site Phone: <br />Site Contact: <br />From: <br />Address: <br />Kate Prysock <br />DC Group, Inc. <br />Site Deployment Team <br />Jacob Nowack <br />Phone: 1-800-838-7927 <br />Fax: 1-612-435-0601 <br />Quote Date: <br />Quote Expires: <br />ORCNTYNC01 <br />975415 <br />Kate Prysock <br />(919)619-8859 <br />Orange County <br />131 W Margaret Ln <br />Hillsborough, NC 27278-2547 <br />2/12/2026 <br />4/26/2026 <br />Fax: <br />Address: <br />Bill to / Quote to <br />Phone: <br />PO Box 8181 <br />Hillsborough, NC 27278 <br />Page 1 of 4 <br />ModelSystemManufacturerID <br />Existing Equipment: <br />Asset TagSerial No <br />UPS001ORCNTYNC01 Eaton UPS 9390 EC141CBA06 <br />This quote is for the purchase and installation of (1) static switch for the customer's 160kVA Eaton 9390 UPS (s/n <br />EC141CBA06). <br />Freight is estimated for quoting purposes only. Estimated here is standard dock-to-dock delivery. Any special delivery <br />requirements, such as expedited shipment, a lift gate, or inside delivery will likely incur additional costs at the customer's <br />expense. <br />*A load shutdown will be required to complete this work. <br />*All deliveries should be inspected by the facility upon arrival. If any damage is seen or suspected, a note will need to be <br />made on the BOL. If damage occurs during shipment and a note is not made on the BOL upon delivery, charges for <br />replacement product will apply.* <br />*Lead times vary based on manufacturer's availability.* <br />*Tax not included* <br />Equipment Quoted: <br />Quote: <br />Parts Cost:$7,087.00 <br />Normal Business Hours Labor:$1,710.00 <br />(Monday to Friday, 8:00 AM to 5:00 PM) <br />After Business Hours Labor:$2,150.00 <br />(Monday to Friday, 5:01 PM to 7:59 AM) <br />Weekend/Holiday Labor:$2,630.00 <br />(Weekends/Holidays) <br />Estimated Shipping Cost:$200.00 <br />© 2026 DC Group, Inc.1.800.838.7927 | dc-group.com <br />DCG-QPM-FRM0025, Revison Date:10/25/2019Page 1 of 4 <br />Docusign Envelope ID: F6CBF447-94D0-4F5F-B1F8-1F45193780E2
The URL can be used to link to this page
Your browser does not support the video tag.