Orange County NC Website
Option file upload to <br />show additional <br />calculations. <br />D13a. How many <br />YEARS will this <br />emissions reduction <br />take place as a result <br />of your project? <br />Please consider the <br />expected lifetime of <br />the <br />technology/program/impact, <br />etc. Note: Solar <br />installations should <br />enter 25 years as <br />the project lifetime. <br />3 <br />D13b. Please explain <br />how you came up <br />with the number of <br />years in the previous <br />question and add any <br />other relevant <br />information. Please <br />list any sources <br />used. (200 word limit) <br />TABLE and W ildflower Lane’s license agreement with Orange County for <br />use of the land at Twin Creeks is for 3 years. <br />D14. Please <br />describe the location <br />of the emissions <br />reduction. W here <br />would fossil fuels <br />have been burned if <br />not for your project? <br />For projects that <br />reduce electricity <br />usage or that <br />generate solar <br />energy, feel free to <br />state “grid-tied <br />electricity reduction” <br />if you cannot <br />determine the <br />location of emissions <br />produced from <br />electric power <br />generation. (200 <br />word limit) <br />Fossil fuels would have been burned across the country with airplane and <br />semi-truck usage. <br />Docusign Envelope ID: 607995AB-FD72-4B81-91C2-2C0A73A91963