Orange County NC Website
D8. During and after <br />the project, what will <br />your continued <br />engagement with the <br />impacted community <br />be? (200 word limit) <br />TABLE delivers food to kids year-round for as long as their families need. <br />The intention is that this project will continue for the foreseeable future - we <br />have a 3-year lease (at a token $100/year). Children and families will <br />continue to receive healthy locally-grown food as long as TABLE is around. <br />Residents of the area are welcome to volunteer on the farm project as well! <br />D9. Please describe <br />any other aspect of <br />your project that is <br />relevant to Social <br />Justice, <br />Environmental <br />Justice and Racial <br />Equity. (200 word <br />limit) <br />TABLE has implemented new equity criteria for bringing families off the <br />waitlist so that families who are most in need are prioritized. These equity <br />guidelines include income, housing status, number of wage earners, <br />number of children, length of time on our waitlist, and other factors. Our <br />intention is that those who are most in need of food will be able to access it <br />the most quickly. <br />Additionally, we have changed our menu several times over the years and <br />work to provide customization as much as possible to account for a variety <br />of ethnic palates, preferences, and needs (for example, Halal for Muslim <br />families, or limited canned food when families request it - typically those <br />newer to the United States, or beans/rice for those who prefer it). <br />Criterion 2 - Emissions Reduced This criterion has a maximum score of 4 <br />points (out of a total of 26 points). Please see the Grant Project website <br />for estimation tools and the Background and Information document for <br />information about technical assistance. Applicants are encouraged to ask <br />for clarification and technical assistance as early as possible and no later <br />than the posted deadline for questions. <br />D10a. Does your <br />project save on <br />electricity (solar <br />projects should say <br />"yes" to this)? <br />No <br />D10b. Does your <br />project save on <br />gasoline? <br />Yes <br />How many gallons are saved per year? <br />Criterion 2_ Gallons CO2e (3).xlsx <br />D10c. Does your <br />project save on <br />natural gas? <br />No <br />D10d. Does your <br />project save on food <br />waste? <br />Yes <br />How many pounds of food waste are saved per year? <br />Criterion 2_ Pound waste CO2e.xlsx <br />Docusign Envelope ID: 607995AB-FD72-4B81-91C2-2C0A73A91963