Browse
Search
2026-086-E-County Mgr-Solar Equity-St. Joseph's CME Church Solar Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-086-E-County Mgr-Solar Equity-St. Joseph's CME Church Solar Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2026 9:05:34 AM
Creation date
4/9/2026 9:05:12 AM
Metadata
Fields
Template:
Contract
Date
3/10/2026
Contract Starting Date
3/10/2026
Contract Ending Date
3/17/2026
Contract Document Type
Contract
Amount
$28,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D13a. How many <br />YEARS will this <br />emissions reduction <br />take place as a result <br />of your project? <br />Please consider the <br />expected lifetime of <br />the <br />technology/program/impact, <br />etc. Note: Solar <br />installations should <br />enter 25 years as <br />the project lifetime. <br />25 <br />D13b. Please explain <br />how you came up <br />with the number of <br />years in the previous <br />question and add any <br />other relevant <br />information. Please <br />list any sources <br />used. (200 word limit) <br />The emissions reduction will occur over the 25-year lifespan of the solar <br />panels. Trina, the panel manufacturer, guarantees that the system will still <br />produce 84.8% of its original output at year 25. W hile system performance <br />will gradually decline, rising electricity rates, such as the 15.7% Duke <br />Energy increase approved for 2026, will likely increase the financial and <br />environmental value of avoided grid energy over time. Thus, both <br />emissions reduction and cost savings remain significant throughout the <br />system’s full operational life. <br />D14. Please <br />describe the location <br />of the emissions <br />reduction. W here <br />would fossil fuels <br />have been burned if <br />not for your project? <br />For projects that <br />reduce electricity <br />usage or that <br />generate solar <br />energy, feel free to <br />state “grid-tied <br />electricity reduction” <br />if you cannot <br />determine the <br />location of emissions <br />produced from <br />electric power <br />generation. (200 <br />word limit) <br />Grid-tied electricity reduction <br />Docusign Envelope ID: F42389BC-2D83-4E00-BC11-D720BFF48873
The URL can be used to link to this page
Your browser does not support the video tag.