Orange County NC Website
<br /> <br />Page 7 of 9 <br /> <br />owner building occupancy, and/or delivery time line as related to project start and completion dates. <br />The owner is responsible for informing Brady of any facility security regulations and requirements, parking arrangements, <br />requirements for entering and leaving the facility, special rules regarding personnel, vehicles, tools and equipment, and <br />hazard materials on site that we may come in contact with or working in close proximity to. <br />Project Close Out <br />After competition of project and prior to turning the area and equipment over to the owner, a final inspection shall be <br />conducted by the owner’s designate personnel and Brady's onsite superintendent to ensure project has been completed <br />to the owner’s standards. <br />Confidentiality Disclosure <br />The contents of this document are considered proprietary and confidential. This information is to be maintained in <br />confidence and should not be disclosed to others including but not limited to, competitors, customers and suppliers. Any <br />unauthorized use, disclosure or duplication of this information without written consent of Brady is strictly prohibited. <br /> <br />Docusign Envelope ID: 2D4997D5-C5F3-44E9-BE75-4266B9A66160