Orange County NC Website
<br /> <br />Page 4 of 9 <br /> <br /> <br />Electrical <br />Brady will replace existing disconnect, conduit, and conductors that are required for load side electrical service <br />from point of existing disconnect to new packaged unit. Disconnect, conduit, and conductors have been sized per <br />the NEC and based on the packaged unit MOP and MCA provided to Brady by the equipment manufacturer. <br /> <br />Brady will reuse existing breaker, conduit, and conductors on line side. <br /> <br />Electrical connection to equipment will be made with short lengths of flexible "Liquid - Tite" conduit. <br /> <br />All equipment has been selected for 480 volts, 60 hertz, and 3 phase electrical service. <br /> <br />Brady will provide nameplates for identification of all equipment, motor starters, and disconnect switches. <br /> <br />Start-Up <br />A Brady factory-authorized technician will perform start -up and inspection of new packaged unit according to the <br />manufacturers' written instructions. See attachment. <br /> <br />Clarifications <br />All work is based on straight time hours: Monday through Thursday from 7:00 am to 5:30 pm. <br /> <br />Brady requires that the equipment for this project go through a submittal and review process to verify equipment <br />design and performance before the final order of equipment will be released. This is completed to ensure that the <br />end result meets the owner’s expectations. Brady will request that you assign a company representative to review <br />and sign off on the equipment prior to order placement. <br /> <br />When crane work is to be performed over an occupied area a crane lift plan will be provided by the crane <br />company. The plan will be reviewed by Brady’s onsite superintendent and your site appointed personal before any <br />lifting begins. We will require the area surrounding the lift be cleared and barricaded during the work. Once all <br />lifting has been completed, all work may resume. <br /> <br />The packaged unit selected and quoted for this proposal is based on like for alike change out and does not reflect <br />a change in capacity or load calculation for the area this unit servers. <br /> <br />Any code deficiencies related to the existing conditions not specifically identified to be addressed is not included in <br />our scope. <br /> <br />Unforeseen conditions related to the owner’s equipment or building that adversely impact the cost of the project <br />may result in additional changes. <br /> <br />When changing packaged unit out with like size packaged unit, it is assumed the conduit, wire, disconnects, <br />breakers, electrical panel and duct work are adequately sized to serve the proposed packaged unit and are <br />functional and installed per code. <br /> <br />The building heating and cooling load calculations are based on information provided by the owner. Discrepancies of <br />information provided and actual conditions could result in equipment being sized incorrectly. Brady is not responsible for <br />problems resulting from incorrect information provided by the owner. <br /> <br />This proposal excludes all work on energized electrical systems, including but not limited to electrical panels, disconnects, <br />motor control centers (MCCs), switchgear, or similar components. All connections, repairs, and modifications will be <br />performed only after the equipment has been properly de-energized, locked out, and verified safe for work. <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: 2D4997D5-C5F3-44E9-BE75-4266B9A66160