Orange County NC Website
54 <br /> Our Expanded Quarry Reservoir and Jordan Lake Meet our Long-Term Water <br /> Supply Needs and Address Drought Vulnerability <br /> 20 <br /> Jordan Lake Allocation Included <br /> 18 <br /> 16 <br /> Water <br /> bA <br /> E 14 Expanded Quarry Reservoir <br /> SupplyC 12 Yield Also has Uncertainty <br /> a 10 ♦♦ <br /> Yield ♦N♦ <br /> 8 ♦♦♦♦ Actual ~ <br /> Demands ♦♦�N♦♦�♦♦ Baseline,1st and 99th <br /> ?� 6 ♦♦~ Percentile Projections <br /> ca <br /> cc 4 <br /> 2 <br /> 0 <br /> 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 <br /> Fiscal Year <br /> OWASA's Water Supply Yield and Demands-The estimated yield that includes our allocation of water from <br /> Jordan Lake is oversimplified as our access through the Western Intake Partners has not yet been modeled <br /> with our three local supplies. The projections shown in the figure are from 2019. In addition, there is <br /> uncertainty in the yield which is more difficult to quantify than the demand projections. <br />