Browse
Search
Agenda - 09-26-2005-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-26-2005
>
Agenda - 09-26-2005-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 4:53:16 PM
Creation date
8/29/2008 10:46:23 AM
Metadata
Fields
Template:
BOCC
Date
9/26/2005
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20050926
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Schools <br />Middle School #3 Update <br />The Orange County School System broke ground on the new middle school site #3 on <br />November 30, 2004, The project was bid in two parts: (1) Early Sitework Package, with <br />bids opened October 12, 2004; and (2) Building Construction Package, with bids <br />opened December 7, 2004. The Pre - Construction Conference was conducted on <br />February 14, 2005; the project managers and field superintendents for each contractor <br />on the project attended this meeting. Additionally at this meeting, the Notice to Proceed <br />was given to J.H. Allen, the general contractor for the Building Construction Phase of <br />the project. J.H, Allen mobilized and began work on March 28, 2005, which was <br />approximately six weeks after they received the Notice to Proceed; weather was <br />responsible for the delay. <br />The Orange County Board of Education receives periodic updates, the last update <br />being given on September 19, 2005, At that time the following was reported: <br />• Steel erection is complete for the entire school. <br />• Slab on grade poured in Gymnasium, Cafeteria, Auditorium, and C & D Wings. <br />• Completed installation of site water lines. <br />• Installed a `dry hydrant' piped into the pond (for fire protection). <br />• Completed grading of revised east entrance drive and road widening. <br />• Began installation of stone base on east entrance and rear parking lots. <br />• No accidents have occurred on the site since the project began. <br />/pmc9 /05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.