Browse
Search
Agenda - 09-26-2005-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-26-2005
>
Agenda - 09-26-2005-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 4:53:16 PM
Creation date
8/29/2008 10:46:23 AM
Metadata
Fields
Template:
BOCC
Date
9/26/2005
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20050926
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated Cost of New Facilities <br />Elementary School <br />Capacity = 600 students <br />Square Footage <br />95,225 <br />Square Ft per Student <br />1587 <br />Construction Cost <br />Cost Per Square Foot <br />$ 90 <br />$ <br />8,570,250 <br />Site Acquisition <br />Acres: <br />16 <br />Average Cost Per Acre: <br />25,000 <br />$ <br />400,000 <br />Site Development <br />As a percentage of Construction Cost <br />l0% <br />S <br />857,025 <br />Fees <br />As a percentage of Construction Costs and Site Development <br />10% <br />942,728 <br />Moveable Equipment <br />As a percentage of Construction Cost <br />5% <br />$ <br />428,513 <br />Technology <br />Cost per square foot <br />$ 8 25 <br />$ <br />'785,606 <br />(includes cabling and equipment for voice, video and data distribution systems) <br />Construction Contingency As a percentage of Construction Cost and Site Development <br />5% <br />$ <br />471,364 <br />Start -Up Costs <br />Non Personnel One time start -up costs <br />Non Personnel Start Up - one time <br />$ <br />330,000 <br />350,000 <br />Total <br />$ <br />12,785,485 <br />Middle School <br />Capacity = 700 students <br />Square Footage <br />132,192 <br />Square Ft. per Student <br />188, 8 <br />Construction Cost <br />Cost Per Square Foot <br />$ 95 <br />$ <br />12,558,240 <br />Site Acquisition <br />Acres: <br />22 <br />Average Cost Per Acre <br />25,000 <br />$ <br />550,000 <br />Site Development <br />As a percentage of Construction Cost <br />10% <br />$ <br />1,255,824 <br />Fees <br />As a percentage of Construction Costs and Site Development <br />10% <br />1,381,406 <br />Moveable Equipment <br />As a percentage of Construction Cost <br />5% <br />$ <br />627,912 <br />Technology <br />Cost per square foot <br />$ 8 25 <br />$ <br />1,090,584 <br />(inchtdes cabling and equipment for voice, video and data distribution systems) <br />Construction Contingency <br />As a percentage of Construction Cost and Site Development <br />5% <br />$ <br />690,703 <br />Start - -Up Costs <br />Non Personnel Start Up - one time <br />$ <br />350,000 <br />Total <br />$ <br />18,504,670 <br />R <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.