Browse
Search
Agenda - 09-26-2005-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-26-2005
>
Agenda - 09-26-2005-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 4:53:16 PM
Creation date
8/29/2008 10:46:23 AM
Metadata
Fields
Template:
BOCC
Date
9/26/2005
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20050926
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
served. A kitchen preparing 750 meals should be at least 1,938 square feet. The Local <br />basic standards for the Basic School includes a dining area of 3,300 square feet and a <br />kitchen/serving area of 1,940 square feet. <br />12. Miscellaneous /Commons Basic School - 3,400 sq. ft. <br />Tier B - Add 1,855 sq. ft. <br />This area includes miscellaneous space such as additional storage, receiving area, book <br />storage and School Commons area. <br />Local Basic Standards NC Public School Facility <br />(Sq. Ft) Standards (Sq. Ft). <br />Custodial /Book 900 <br />Storage <br />Book Storage 800 <br />Student Commons 1,500 1,500 <br />Tier B includes a larger activities lobby (500 sq ft.) and three academic house centrums <br />at 1,000 square feet each (total 3,500 sq.. ft.). <br />13. Circulation <br />A multiplier of .35 percent is included for space such as storage, mechanical rooms, <br />hallways, toilets, walls, etc. The multiplier is applied to the total square footage of the <br />Basic School plus each additional level. A larger circulation factor than the factor used <br />for an elementary school is necessary for a middle school due to the more complex nature <br />of the facility (laboratories, additional plumbing, etc,) and additional space needed for the <br />hallways (student lockers) <br />14. Cost Per Square Foot <br />For planning purposes a cost of $95 per square foot for construction is to be used <br />Other Facility Considerations <br />Technology <br />Technology for new school construction projects should include funds for the installation of <br />cabling network within the school. The network should be designed to accommodate voice, data <br />and video educational requirements. Realizing that specifics for the technology infrastructure <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.