Browse
Search
Agenda - 09-26-2005-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-26-2005
>
Agenda - 09-26-2005-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 4:53:16 PM
Creation date
8/29/2008 10:46:23 AM
Metadata
Fields
Template:
BOCC
Date
9/26/2005
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20050926
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
preparing 750 meals should be at least 1,938 square feet. The adopted standards include a <br />dining area of 2,400 square feet and a kitchen/serving area of 2,100 <br />Tier B includes additional storage for tables and chairs totaling 200 square feet. <br />12. Miscellaneous /Commons Basic School - 13,00 sq. ft. <br />Tier B - Add 1,855 sq. ft. <br />This area includes miscellaneous space such as additional storage, book storage and <br />School Commons area. In addition, this area includes additional toilets which are <br />required by the State Facility Standards but are calculated as part of the overall <br />circulation multiplier which is applied to the total square footage (see next section). <br />Local Basic Standards NC Public School Facility <br />(Sq. Fi) Standards (Sq. Ft). <br />Boolr Storage 800 800 <br />Tier B includes a Commons area (1,000 sq ft.) and toilets which are calculated over and <br />above the circulation factor of .33 percent. <br />13. Circulation <br />A multiplier of 33 percent is included for space such as storage, mechanical rooms, <br />hallways, toilets, walls, etc. The multiplier is applied to the total square footage of the <br />Basic School plus each additional level. <br />14. Cost Per Square Foot <br />For planning purposes, building costs are calculated based on $90 per square foot for <br />construction. <br />Middle School <br />The total square footage of the Basic School, as outlined in this section of the report, is <br />approximately 113,400 square feet. There are two added to the Basic School... Tier A includes <br />increased space for the afterschool programs, increasing the square footage by a total of 1,620 <br />square feet The remaining tier includes nearly 17,200 square feet of which a large portion is for <br />special project rooms, additional commons space and additional teacher workspace <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.