Browse
Search
Agenda - 05-05-2003-8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 05-05-2003
>
Agenda - 05-05-2003-8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:32:58 PM
Creation date
8/29/2008 10:46:20 AM
Metadata
Fields
Template:
BOCC
Date
5/5/2003
Document Type
Agenda
Agenda Item
8a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft 4/23/03 <br />The report should also include a phasing plan, showing how the park and other <br />public facilities could be developed over time in acost-efficient fashion. <br />3. The report should address and recognize the limitations imposed by safety <br />considerations caused by the site's previous use for waste-disposal purposes, as <br />addressed inpart by a geo-technical report prepared in 1999 ("Report of <br />Geotechnical Evaluation, Closed Hillsborough Landfill Site, July 19, 2000"). <br />Further recommendations maybe needed to address phased remediation of <br />portions of the site. <br />4. The Master Plan should address co-location of existing and future public facilities <br />and the park, and provide fora "seamless transition " between public facilities <br />and park functions wherever possible. <br />5. The Committee should review the "old" 1988 Fairview Park Concept Plan as part <br />of the Master Plan and determine its validity, if any. <br />6. The operation and maintenance responsibilities of the park are addressed in <br />subsection below. <br />2. EXPECTATIONS OF MASTER PLAN FINAL PRODUCT /MEMBERSHIP OF <br />MASTER PLAN COMMITTEE <br />Product: A Master Plan report and map, as described above, by August, 2004 <br />Timeframe for Product: November 2003 -August, 2004 <br />Proposed Timetable of Activities* <br />Master Plan Work Group appointed September, 2003 <br />Work Group begins work November, 2003 <br />Interim re ort to Board of Coun Commissioners March, 2004 <br />Work Group completes Master Plan August, 2004 <br />Board of County Commissioners/TowYBnard of September-October, 2004 <br />Commissioners review and approve Master Plan <br />Town Board of Commissioners review and approval of October-December, 2004 <br />lan <br />site <br />p <br />Develo bids and bid project January-March, 2005 <br />Construction of Phase I (Park) March-September 2005 <br />Final Steps: Once completed, the Master Plan will be submitted to both Boards of <br />Commissioners for approval. The Boards may either approve the Plan, remand it back for <br />further work, or decide not to pursue the Plan <br />Proposed Membership of Master Plan Committee: <br />- xx Orange County Commissioners <br />