Orange County NC Website
D11. How many <br />TOTAL metric tons of <br />greenhouse gas <br />emissions will your <br />project reduce or <br />avoid OVER THE <br />LIFETIME of the <br />project? [Please use <br />the number(s) <br />calculated above <br />(row 4 of tables), or <br />provide your own <br />estimate if those <br />figures were <br />insufficient or if you <br />have additional <br />measures to include.] <br />5280 <br />D12. W ere any <br />additional <br />calculations required <br />in coming up with the <br />number entered <br />above (this includes <br />adding two or more <br />numbers together)? <br />No <br />D13a. How many <br />YEARS will this <br />emissions reduction <br />take place as a result <br />of your project? <br />Please consider the <br />expected lifetime of <br />the <br />technology/program/impact, <br />etc. Note: Solar <br />installations should <br />enter 25 years as <br />the project lifetime. <br />40 <br />Docusign Envelope ID: CB1A7685-96B7-4FBD-80E0-8CF756D5E579