Browse
Search
Agenda 03-05-2026; 8-i - Whitted Complex Chiller Installation Service Contract Award
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2026
>
Agenda - 03-05-2026 Business Meeting
>
Agenda 03-05-2026; 8-i - Whitted Complex Chiller Installation Service Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 3:31:59 PM
Creation date
2/26/2026 3:37:02 PM
Metadata
Fields
Template:
BOCC
Date
3/5/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-i
Document Relationships
Agenda for March 5, 2026 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2026\Agenda - 03-05-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> + BRADY <br /> ■ (2) Chilled Water Differential Pressure <br /> • BACnet MS/TP integration to Chiller Control Panel (Chiller to be <br /> provided with BACnet communications enabled) <br /> • BACnet MS/TP integration to (3) Pump VFD Interface (Siemens <br /> shall provide VFDs with BACnet communications enabled) <br /> Implement control sequences: <br /> • Enable/disable based on system demand <br /> ■ Chilled water temperature reset logic <br /> ■ Lead/lag if multiple chillers exist <br /> o Test all alarms and interlocks. <br /> Scope of Work — Chilled Water Pump Replacement <br /> 1. Mechanical <br /> • Remove existing chilled water pumps. <br /> • Install new pumps with VFDs, suction diffusers, triple-duty valves, and flexible <br /> connectors. <br /> • Grout pump bases and align shafts. <br /> • Insulate piping and provide heat trace if required. <br /> • Label piping per ANSI standards. <br /> 2. Electrical <br /> • Provide power to new pump motors and VFDs. <br /> • Install disconnect switches and verify grounding. <br /> • Test voltage and rotation before start-up. <br /> 3. Controls <br /> • Integrate pumps into BAS for: <br /> o Start/stop, speed control, DP reset logic. <br /> • Configure lead/lag sequencing. <br /> • Install pressure sensors for differential pressure control. <br /> • Test alarms and interlocks. <br /> 808 Aviation Parkway, Suite 1100, Morrisville, NC 27560 — Tel: 866.328.2764 — bradyservices.com <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.