Browse
Search
Agenda 03-05-2026; 8-l - Professional Services Contract with Catawba Valley Engineering and Testing, P.C., for Lake Orange Intake Tower Replacement Project Geotechnical Services
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 03-05-2026 Business Meeting
>
Agenda 03-05-2026; 8-l - Professional Services Contract with Catawba Valley Engineering and Testing, P.C., for Lake Orange Intake Tower Replacement Project Geotechnical Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 3:32:38 PM
Creation date
2/26/2026 3:33:47 PM
Metadata
Fields
Template:
BOCC
Date
3/5/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-l
Document Relationships
Agenda for March 5, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 03-05-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CATAWBA VALLEY <br /> \111eENGINEERING&TESTING Cody B. Dobbins, PE <br /> Vice President, Drilling Services Manager <br /> Experience Summary of Qualifications <br /> 2017-Present Cody is responsible for managing the drilling crews, developing <br /> Catawba Valley Engineering& geotechnical exploration procedures for project-specific <br /> Testing, P.C. applications, and evaluating the subsurface exploration data <br /> collected to prepare the geotechnical report for the client. In <br /> Licenses/Certifications addition, he assists with the management of the Construction <br /> Registered Professional Engineer Materials Testing (CMT) projects. <br /> NC,SC, MD <br /> Project Experience <br /> Certified Field Concrete <br /> Technician I,American Concrete ➢ Blue Ridge Parkway NP-BLR1 2813 RSS, Mile Marker 274.9, <br /> Institute(ACI)and NCDOT Deep Gap, North Carolina Subsurface exploration included SPT <br /> Division of Highways and NQ Wireline coring, a geotechnical engineering evaluation, <br /> and professional design services to facilitate construction of a <br /> Confined Space Safety for <br /> Competent Person Certified reinforced soil slope required to address a slope failure.The slope <br /> failure affected ±150 to 200 linear feet of roadway with the failure <br /> Confined Space Entry Certified plane of the slope near the centerline of the roadway. The height <br /> MSE Retaining Wall Mistakes& of the slope was 35 feet. <br /> How to Avoid ➢ National Art Museum, Washington, District of Columbia <br /> HAZWOPER Performed Seismic Cone Penetration testing (sCPT) and <br /> HAZMAT&Nuclear Gauge Dilatometer Soundings (DMT) to aid in the design and <br /> Radiation Training construction of a new structure at an art museum in Washington <br /> DC. Shear wave velocity testing was performed along with three <br /> NC Well Drilling License Level B soundings to depths of 80+ feet, with one of the borings turned <br /> CSX Roadway Worker Training into a 40-foot monitoring well. <br /> OSHA 30 / CPR/AED/FA ➢ Renewable Energy Exploration in Southern Nebraska, Central <br /> Mobile Elevated Work Platform Kansas, and North and Central Iowa Performed over 350 soil <br /> Telehandler, Industrial Forklift, borings across 95 miles consisting of a combination of Standard <br /> Earth Movers Penetration Testing (SPT), rock coring, Cone Penetration (CPT) <br /> soundings, Seismic Cone Penetration soundings (sCPT) and Flat <br /> Education Blade Dilatometer soundings (DMT) to aid in the design and <br /> Bachelor of Science, Mechanical construction of a renewable energy sites. <br /> Engineering,West Virginia ➢ CRSWMA- Newport Transfer Station, Newport, North Carolina <br /> University, Morganton,WV 2014- Subsurface exploration and geotechnical engineering for the <br /> 2018 design and construction of the Newport Transfer Station. Scope of <br /> Master of Science, Civil work included drilling thirty-five (35) soil test borings, collection <br /> Engineering, University of North and classification of representative samples of soil, preparation <br /> Carolina at Charlotte, NC Fall, of boring logs, boring location plan, and subsurface profile, <br /> 2025 evaluation of the encountered subsurface conditions, and <br /> preparation of geotechnical report. <br /> ➢ O'Hare Airport, Chicago, Illinois Performed a subsurface <br /> exploration and geotechnical evaluation for a subsurface tunnel <br /> and utility installation at Terminal C at the O'Hare airport in <br /> Chicago, Illinois. <br />
The URL can be used to link to this page
Your browser does not support the video tag.