CATAWBA VALLEY 22 <br /> v ENGINEERING&TESTING <br /> Scope of Services <br /> CVET acknowledges receipt of Addendum 1 dated November 6, 2025, and Addendum 2 dated <br /> November 24, 2025. <br /> CVET understands the scope of work consists of five (5) soils test borings. Four (4) soils test borings <br /> will be over water and one (1) will be on land. The four (4) over water borings require a 5-foot rock <br /> core upon encountering bedrock. We understand that the on-land boring will be converted to a 2- <br /> inch PVC standpipe piezometer with a flush mount well monument. We also understand the lab <br /> testing requests and can perform the requested testing in-house allowing for increased efficiency. <br /> Based upon our understanding of the timeline and urgency of the requested data, CVET proposes to <br /> perform the over water drilling using two (2) sectional barges pinned together and a push boat to <br /> create a safe and efficient working platform for completing the over water borings. <br /> To expedite the project, CVET proposes to complete the on-land boring on the first day of <br /> mobilization. While one crew is completing the soil boring on land, one crew will unload, place and <br /> construct the sectional barges for the over water drilling. Day two will consist of mobilizing the drill <br /> rig to the sectional barge and begin over water drilling operations. <br /> CVET anticipates the field work will take 7 to 10 days to complete from initial mobilization to <br /> complete demobilization. Based on our current schedule, we could begin mobilization the week of <br /> January 12, 2026. <br /> 7 <br /> r <br /> s <br /> r <br /> Relevant Factors <br /> CVET offers CPT, DMT and standard SPT drilling methods. It is our experience that engineers value <br /> the data from insitu test sounding such as CPT and/or DMT over SPT data for foundation engineering <br /> (Intake Tower Foundations). CVET proposes perform CPT and/or DMT soundings from the mudline <br /> to probe refusal conditions. If probe refusal is prior to bedrock, standard SPT sampling will be used <br /> to reach bedrock/auger refusal elevations. Once bedrock is encountered, CVET will perform a 5-foot <br /> wireline rock core. If the insitu testing methods (CPT/DMT) are not requested, CVET will perform <br /> standard SPT sampling as outlined in the RFQ. <br />