Browse
Search
Agenda 03-05-2026; 8-i - Whitted Complex Chiller Installation Service Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 03-05-2026 Business Meeting
>
Agenda 03-05-2026; 8-i - Whitted Complex Chiller Installation Service Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 3:31:59 PM
Creation date
2/26/2026 3:33:46 PM
Metadata
Fields
Template:
BOCC
Date
3/5/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-i
Document Relationships
Agenda for March 5, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 03-05-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br /> BRADY <br /> o Disconnect and remove existing chiller load side power and control wiring. <br /> o Reuse existing disconnect. <br /> o Disconnect pumps P-1,2,5 <br /> • Installation <br /> o Install new VFD's for pumps P-1,2,5 and wire <br /> o Reconnect pumps P-1,2,5 from load side of VFD's <br /> o Provide new load side power feed from panel to chiller per manufacturer's <br /> requirements. <br /> • Testing <br /> o Verify proper rotation and voltage before energizing chiller. <br /> 3. Controls <br /> • Demolition <br /> o Remove old control wiring and sensors associated with previous chiller. <br /> • Installation <br /> o Integrate new chiller into BAS via BACnet/IP or Modbus (as specified). <br /> • Configure points for: <br /> • Siemens BACnet IP PXC Controller with the following points (26 <br /> hardwired points, 40 integration points): Chiller Enable <br /> ■ Chiller Status <br /> • Chiller Setpoint <br /> • Chiller Fault <br /> • Chiller Supply Temperature <br /> • Primary Pump P-5 Start/Stop wiring (Pump to be started by chiller) <br /> • Primary Pump P-5 Status <br /> • Primary Pump P-5 VFD Fault <br /> • Primary Pump P-5 VFD Speed Control <br /> • Primary Pump P-5 VFD Speed Feedback <br /> • Building Chilled Water Return Temperature <br /> ■ Building Chilled Water Return Flow <br /> ■ Decoupler Line Temperature <br /> ■ (2) Secondary Pump (P-1 and P-2) Start/Stop <br /> • (2) Secondary Pump (P-1 and P-2) Status <br /> • (2) Secondary Pump (P-1 and P-2) VFD Fault <br /> • (2) Secondary Pump (P-1 and P-2) VFD Speed Control <br /> • (2) Secondary Pump (P-1 and P-2) VFD Speed Feedback <br /> • Building Chilled Water Supply Temperature <br /> 808 Aviation Parkway, Suite 1100, Morrisville, NC 27560 — Tel: 866.328.2764 — bradyservices.com <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.