Browse
Search
Agenda 03-05-2026; 8-i - Whitted Complex Chiller Installation Service Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 03-05-2026 Business Meeting
>
Agenda 03-05-2026; 8-i - Whitted Complex Chiller Installation Service Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 3:31:59 PM
Creation date
2/26/2026 3:33:46 PM
Metadata
Fields
Template:
BOCC
Date
3/5/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-i
Document Relationships
Agenda for March 5, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 03-05-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> 13MADY <br /> Scope of Work <br /> Scope of Work — Chiller Replacement <br /> 1. Mechanical <br /> • Demolition <br /> o Disconnect and remove the existing chiller, associated piping, valves, insulation, <br /> and supports. <br /> o Drain and properly dispose of existing refrigerant per EPA guidelines. <br /> o Remove old isolation valves, strainers, and flexible connectors. <br /> o Disconnect and remove pumps P-1,2,5 <br /> • Installation <br /> o Install new chiller on existing or new housekeeping pad (verify structural <br /> adequacy). <br /> • Chiller not included in the proposal. Owner has already purchased <br /> chiller. <br /> o Provide vibration isolation pads and anchors. <br /> o Connect to existing chilled water supply and return piping; install new isolation <br /> valves, strainers, and flexible connectors. <br /> o Install new pressure/temperature ports for commissioning. <br /> o Insulate all new piping with vapor-sealed insulation and aluminum jacket. <br /> o Provide heat trace for exposed piping if required. <br /> o Install new condensate drain piping to approved discharge point. <br /> o Install new pumps P-1,2,5 <br /> o Label all piping per ANSI standards. <br /> • Testing <br /> o Pressure test piping connections. <br /> o Flush and clean chilled water loop before final connection. <br /> o Perform leak test on refrigerant circuit. <br /> o Complete factory start-up and commissioning. <br /> 2. Electrical <br /> • Demolition <br /> 808 Aviation Parkway, Suite 1100, Morrisville, NC 27560 — Tel: 866.328.2764 — bradyservices.com <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.