Orange County NC Website
26 <br /> smithsoinnett <br /> ARCHITECTURE <br /> 1 includes$15,800 for parking expansion <br /> 2 includes design following $3500 parking feasibility study <br /> 3 Includes$4,500 for EAQ design <br /> The Design Fee shall be billed in the following percentages: <br /> Schematic Design/ Design Development 35% 5 weeks <br /> Construction Documents 40% 6 weeks <br /> Bid Administration 5% 4 weeks. <br /> Construction Administration 20% 24 weeks <br /> 100% 39 weeks +/- <br /> HOURLY RATES: <br /> All Additional Services are to be mutually determined and agreed to in writing prior to the commencement of the <br /> work. Hourly rates for the Architect and Engineers shall be provided as follows: <br /> Architectural: <br /> Principal $ 225/hour <br /> Project Manager $ 200/hour <br /> Project Architect $ 175/hour <br /> Project Designer $ 150/hour <br /> Administrative $ 80/hour <br /> NOT INCLUDED WITHIN PROPOSED FEE: <br /> • Geotechnical Survey, Topographic Survey, Hazardous Materials Survey and Testing <br /> • Hazardous Materials testing and removal. <br /> • Construction Testing Services <br /> • Special Inspection services as described in Chapter 17 of the NC Building Code. <br /> • Commissioning <br /> • Bilateral Amplification <br /> • LEED Certification <br /> • Commissioning <br /> • All permit application fees <br /> Reimbursable Expenses <br /> Reimbursable expenses include, but may not be limited to, all review and permit fees, overnight postage, mileage, <br /> and reproduction and printing costs with an administrative fee of twenty percent (20%). The Architect will provide <br /> prints to the Owner if requested, otherwise the Owner may elect to print documentation directly in house. <br /> Instruments of Service <br /> Plans and specifications are instruments of service and remain the property of Smith Sinnett Architecture, P.A. <br /> Indemnification <br /> 4600 Lake Boone Trail, Suite 205 1 Raleigh, NC 27607 1919.781.8582 1 HUB Certified I smithsinnett.com <br />