Orange County NC Website
7 <br /> OWASA Quarterly Report <br /> January 2026 <br /> Page 6 <br /> East Poplar Water Line Replacement:This project was completed in December 2025, and <br /> temporary paving is in place.The Town of Carrboro is planning to complete final paving in late <br /> 2026. <br /> South Circle Drive Water Line Replacement: Installation of new water lines through the <br /> neighborhood was complete last quarter, but before residents in one part of the neighborhood <br /> were connected to a section of new line, repeated water quality samples were unsatisfactory. <br /> Crews will soon begin removing this section of line and replacing it.This project is expected to <br /> be complete by February. <br /> We are happy to provide more detailed information on the items above or other topics of interest as <br /> desired. Please feel free to contact our Executive Director,Todd Taylor(ttaylor@owasa.org or 919-537- <br /> 4216), or me. <br /> Sincerely, ����•'"`a 11 a r',,e <br /> _ r <br /> z AU- <br /> Michael <br /> Michael Hughes, Chair �6g7 <br /> Board of Directors „(, :Co <br /> cc Cog' � <br /> ••. NC1NE. • " �� <br /> F4 v�,•�' <br /> Attachments <br /> cc: Mr. Ted Voorhees, Chapel Hill Town Manager <br /> Mr.Travis Myren, Orange County Manager <br /> Ms. Patrice Toney, Carrboro Town Manager <br /> OWASA Board of Directors <br /> Todd Taylor, OWASA Executive Director <br />